Block 0911, lot 028
1960 Jefferson St
- City’s use
- Single Family Residential
- Built
- 1931
- Stories
- 2
- Units
- 1
- Rooms
- 3 bedrooms, 2 bathrooms
- Building
- 1,826 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
5 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 14, 2016 | Completed final sign-off Apr 2017 | 1960 Jefferson St | Add A Garage Inc. | remove interior bearing walls for easier parking access. install three new steel beams over garage and plywood shearwall towards front of garageDetails
remove interior bearing walls for easier parking access. install three new steel beams over garage and plywood shearwall towards front of garage | $10,000 |
| Feb 3, 2015 | Never finaled issued Feb 2015, no final | 1960 Jefferson St | street space permitDetails
street space permit | ||
| Dec 19, 2014 | Completed final sign-off Nov 2015 | 1960 Jefferson St | Gil Construction & Assoc Inc. | revision to 201409186689. remove dryrot and reframe wd ceiling at master bathDetails
revision to 201409186689. remove dryrot and reframe wd ceiling at master bath | |
| Sep 18, 2014 | Completed final sign-off Feb 2016 | 1960 Jefferson St | Gil Construction & Assoc Inc. | kitchen remodel, bathroom remodel on 2nd floor, added master bathroom, new stair connecting 1st floor and 2nd floors, create new bedroom and laundry at 1st floor, remodel 1st floor bathroom. n/a for the maher ordinance #155-13Details
kitchen remodel, bathroom remodel on 2nd floor, added master bathroom, new stair connecting 1st floor and 2nd floors, create new bedroom and laundry at 1st floor, remodel 1st floor bathroom. n/a for the maher ordinance #155-13 | $135,000 |
| Sep 18, 2008 | Completed final sign-off Feb 2009 | 1960 Jefferson St | Diamond Building & Construction | work @ unit# 1962 only. remodel of 2 complete bathrooms at the tope floor. replace tub, toilet, shower area, floor tiles. install new windows in the master shower in the same location as existing. electricl heater will remain as existing. provide high efficacy lights per title 24 requirement.Details
work @ unit# 1962 only. remodel of 2 complete bathrooms at the tope floor. replace tub, toilet, shower area, floor tiles. install new windows in the master shower in the same location as existing. electricl heater will remain as existing. provide high efficacy lights per title 24 requirement. | $30,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Gil Construction & Assoc Inc. (2), Add A Garage Inc., Diamond Building & Construction
- Architects
- Michael Schulte
- Engineers
- Donald David
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.