Giants Construction
- Based in
- El Cerrito
- On San Francisco permits
- Nov 2007 to Apr 2021
- Last 24 months
- 0 permits filed
44 permits since 2000: 36 completed, 5 never finaled, 3 expired or cancelled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
5 stairs permits: 5 completed. Typically 41 days from filing to permit and 212 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 21, 2019 | Completed final sign-off Jan 2020 | 1723 09th Av | replace (e) front stair in kindDetails
replace (e) front stair in kind | $8,000 |
| Jan 11, 2019 | Completed final sign-off Oct 2019 | 408 Rivera St | remodel (e) kitchen & bathroom and add new bathroom @ 2nd floor; remove (e) interior stair and infill (e) lightwell @ ground floor; relocate (e) front entry door & add new rear deck; 4 skylights @ 2nd floor; 2 new bedrooms, 1 bath & media room to be constructed @ ground floorDetails
remodel (e) kitchen & bathroom and add new bathroom @ 2nd floor; remove (e) interior stair and infill (e) lightwell @ ground floor; relocate (e) front entry door & add new rear deck; 4 skylights @ 2nd floor; 2 new bedrooms, 1 bath & media room to be constructed @ ground floor | $100,000 |
| Oct 31, 2018 | Completed final sign-off Jul 2019 | 2186 29th Av | 1st floor: modify extg spaces to new family, study, new lobby, and entry door. at 2nd floor: remodel extg kitchen, bathroom, bedrooms, infill 2 lightwell and remove stair.Details
1st floor: modify extg spaces to new family, study, new lobby, and entry door. at 2nd floor: remodel extg kitchen, bathroom, bedrooms, infill 2 lightwell and remove stair. | $99,000 |
| Apr 10, 2018 | Completed final sign-off Jan 2020 | 1466 Church St | stair repair, foundation replace outside. legalize back stairs. provide new guard rail and handrail.Details
stair repair, foundation replace outside. legalize back stairs. provide new guard rail and handrail. | $30,000 |
| Mar 17, 2015 | Completed final sign-off Jul 2015 | 125 Arleta Av | remodel kitchen and bathroom, add a new bathroom , install 4 new windows on 2/f, add home office, 2 bedrooms and a full bath, add new rear deck with stair on 1/f, replace water heater.Details
remodel kitchen and bathroom, add a new bathroom , install 4 new windows on 2/f, add home office, 2 bedrooms and a full bath, add new rear deck with stair on 1/f, replace water heater. | $70,000 |