Back to kitchen remodel contractors
Giants Construction
- Based in
- El Cerrito
- On San Francisco permits
- Nov 2007 to Apr 2021
- Last 24 months
- 0 permits filed
44 permits since 2000: 36 completed, 5 never finaled, 3 expired or cancelled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
15 kitchen remodel permits: 12 completed, 2 never finaled, 1 expired or cancelled. Typically 29 days from filing to permit and 211 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 25, 2020 | Completed final sign-off Dec 2021 | 2657 30th Av | construct 2 bedroom, 1 full bathroom & media room at ground floor. remodel (e) kitchen, bathroom. add one full bathroom & replace (e) sheetrock w/ new at 2nd floor.Details
construct 2 bedroom, 1 full bathroom & media room at ground floor. remodel (e) kitchen, bathroom. add one full bathroom & replace (e) sheetrock w/ new at 2nd floor. | $120,000 |
| Jul 14, 2020 | Expired or cancelled expired Jul 2025 | 2071 35th Av | revision to 201909121519. change kitchen and living room layout. change round flr bath layout per planDetails
revision to 201909121519. change kitchen and living room layout. change round flr bath layout per plan | |
| Aug 9, 2019 | Completed final sign-off Oct 2019 | 22 Morrell St | remodel existing kitchen and bathroom in kind. replace counter cabinets and fixtures.Details
remodel existing kitchen and bathroom in kind. replace counter cabinets and fixtures. | $12,000 |
| Jan 11, 2019 | Completed final sign-off Oct 2019 | 408 Rivera St | remodel (e) kitchen & bathroom and add new bathroom @ 2nd floor; remove (e) interior stair and infill (e) lightwell @ ground floor; relocate (e) front entry door & add new rear deck; 4 skylights @ 2nd floor; 2 new bedrooms, 1 bath & media room to be constructed @ ground floorDetails
remodel (e) kitchen & bathroom and add new bathroom @ 2nd floor; remove (e) interior stair and infill (e) lightwell @ ground floor; relocate (e) front entry door & add new rear deck; 4 skylights @ 2nd floor; 2 new bedrooms, 1 bath & media room to be constructed @ ground floor | $100,000 |
| Oct 31, 2018 | Completed final sign-off Jul 2019 | 2186 29th Av | 1st floor: modify extg spaces to new family, study, new lobby, and entry door. at 2nd floor: remodel extg kitchen, bathroom, bedrooms, infill 2 lightwell and remove stair.Details
1st floor: modify extg spaces to new family, study, new lobby, and entry door. at 2nd floor: remodel extg kitchen, bathroom, bedrooms, infill 2 lightwell and remove stair. | $99,000 |
| Mar 15, 2018 | Completed final sign-off Nov 2019 | 20 Stratford Dr | 1) remodel extg kitchen, remove extg partition wall in dining room, and construct half bath room at main floor. 2)legalize extg bed room and bath room at ground floor.Details
1) remodel extg kitchen, remove extg partition wall in dining room, and construct half bath room at main floor. 2)legalize extg bed room and bath room at ground floor. | $36,000 |
| Oct 19, 2017 | Completed final sign-off Nov 2018 | 1837 Hayes St | add 1 full bath, remodel e bath and kitchenDetails
add 1 full bath, remodel e bath and kitchen | $32,000 |
| Oct 5, 2017 | Completed final sign-off Nov 2018 | 1839 Hayes St | add (1) new full bath, remodel (e) kitchen & bath.Details
add (1) new full bath, remodel (e) kitchen & bath. | $23,000 |
| Sep 18, 2017 | Completed final sign-off Jul 2018 | 4130 Geary Bl | construct four (n) bedroom, one (n) bathroom, laundry room, relocate kitchen & living room, rewire electrical all at residential unit. n/a ordinance #155-13. no exterior work visible from streetDetails
construct four (n) bedroom, one (n) bathroom, laundry room, relocate kitchen & living room, rewire electrical all at residential unit. n/a ordinance #155-13. no exterior work visible from street | $55,000 |
| Oct 24, 2016 | Completed final sign-off Jun 2017 | 2420 Moraga St | 1) remodel ground floor to have one bedroom, family room and one full bath. 2)remodel kitchen & 1 full bathroom on 2nd floor. 3)convert extg storage into new 1/2 bathroom on 2nd floor. no visible work from street.Details
1) remodel ground floor to have one bedroom, family room and one full bath. 2)remodel kitchen & 1 full bathroom on 2nd floor. 3)convert extg storage into new 1/2 bathroom on 2nd floor. no visible work from street. | $42,000 |
| Nov 24, 2015 | Completed final sign-off Jul 2016 | 454 32nd Av | ground floor: remodel to have 2 bedrooms, family room, 2 full bathrooms and storage room. install laundry, gas furnace and water heater in garage. 2nd floor: infill light well. remodel master suite with full bathroom and walkin closet. add 1/2 bath. remodel kitchen w/all new fixtures & finishes.Details
ground floor: remodel to have 2 bedrooms, family room, 2 full bathrooms and storage room. install laundry, gas furnace and water heater in garage. 2nd floor: infill light well. remodel master suite with full bathroom and walkin closet. add 1/2 bath. remodel kitchen w/all new fixtures & finishes. | $82,000 |
| Oct 9, 2015 | Completed final sign-off Nov 2015 | 1824 Rivera St | bathrom remodel and kitchen remodel: replace (e) kitchen cabinets, countertop, and electrical outlets. replace (e) bathroom toilet, bath tub, faucet, sink and tile.Details
bathrom remodel and kitchen remodel: replace (e) kitchen cabinets, countertop, and electrical outlets. replace (e) bathroom toilet, bath tub, faucet, sink and tile. | $20,000 |
| Apr 15, 2015 | Never finaled issued Apr 2015, no final | 586 41st Av | remodel of e unit 586-588 41st ave. 586 41st unit, reconfigure floor layout, removed and relocate e bath, kitchen and bedrooms. 588 41st unit, redonfigure floor layout, convert e living to bedroom. seismic upgrade per 2013 2013 cbc sf amendmentDetails
remodel of e unit 586-588 41st ave. 586 41st unit, reconfigure floor layout, removed and relocate e bath, kitchen and bedrooms. 588 41st unit, redonfigure floor layout, convert e living to bedroom. seismic upgrade per 2013 2013 cbc sf amendment | $48,000 |
| Mar 17, 2015 | Completed final sign-off Jul 2015 | 125 Arleta Av | remodel kitchen and bathroom, add a new bathroom , install 4 new windows on 2/f, add home office, 2 bedrooms and a full bath, add new rear deck with stair on 1/f, replace water heater.Details
remodel kitchen and bathroom, add a new bathroom , install 4 new windows on 2/f, add home office, 2 bedrooms and a full bath, add new rear deck with stair on 1/f, replace water heater. | $70,000 |
| Mar 17, 2015 | Never finaled issued Apr 2015, no final | 1535 15th St | remodel kitchen & bathroom, replace 6 windows @ rear, replace drywall, replace water heater. add closet. all fire rated assemblies to be maintained. window u factor 0.32 or better.Details
remodel kitchen & bathroom, replace 6 windows @ rear, replace drywall, replace water heater. add closet. all fire rated assemblies to be maintained. window u factor 0.32 or better. | $30,000 |