Georgio Atana
- Based in
- Pacifica
- On San Francisco permits
- Oct 2011 to Jul 2026
- Last 24 months
- 6 permits filed
36 permits since 2000: 29 completed, 7 never finaled.
Of the 7 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
4 stairs permits: 4 completed. Typically 6 days from filing to permit and 144 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 15, 2015 | Completed final sign-off Oct 2015 | 367 Capistrano Av | revision to pa #201510018628 - rebuild exterior stair for in-kind size.Details
revision to pa #201510018628 - rebuild exterior stair for in-kind size. | $2,000 |
| Oct 1, 2015 | Completed final sign-off Nov 2015 | 367 Capistrano Av | repair existing stairs (concrete) at front of house,not more than 50% repair in kind,use same material to cover 7 waterproof the concrete stairs,call district inspector prior to start of work dry wall repairDetails
repair existing stairs (concrete) at front of house,not more than 50% repair in kind,use same material to cover 7 waterproof the concrete stairs,call district inspector prior to start of work dry wall repair | $25,000 |
| Sep 11, 2015 | Completed final sign-off May 2016 | 1457 Fulton St | to comply with nov 200907332 item 3 only, repair front stairs.Details
to comply with nov 200907332 item 3 only, repair front stairs. | $10,000 |
| Jun 24, 2015 | Completed final sign-off May 2016 | 817 Oak St | general renovation of 1st story to include regrading for increased ceiling height, nw stepped fndations, slabs, nfpa 13 sprinkler system kitchen, wndws, doors, mech, plmg, electrical, finishes and fixture. new internal stair connectin 1st & 2nd story. relocate 2nd flr kitchn to 1st to create 2ndDetails
general renovation of 1st story to include regrading for increased ceiling height, nw stepped fndations, slabs, nfpa 13 sprinkler system kitchen, wndws, doors, mech, plmg, electrical, finishes and fixture. new internal stair connectin 1st & 2nd story. relocate 2nd flr kitchn to 1st to create 2nd | $25,000 |