Back to kitchen remodel contractors
Georgio Atana
- Based in
- Pacifica
- On San Francisco permits
- Oct 2011 to Jul 2026
- Last 24 months
- 6 permits filed
36 permits since 2000: 29 completed, 7 never finaled.
Of the 7 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
8 kitchen remodel permits: 7 completed, 1 never finaled. Typically 1 days from filing to permit and 126 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 12, 2024 | Completed final sign-off Apr 2025 | 225 Downey St | unit#5 replace (1) kitchen and cabinets sink and kitchen faucet, (1) bathroom vanity, toilet and tub, install new carpetDetails
unit#5 replace (1) kitchen and cabinets sink and kitchen faucet, (1) bathroom vanity, toilet and tub, install new carpet | $65,000 |
| Jan 18, 2024 | Completed final sign-off May 2024 | 149 Julian Av | drywall repair and replacment in 3 areas- bedroom, bathroom, kitchen. install new kitchen cabinets and counter top. replace sink, toilet, and bath tub, sink- in bathroom. paint.Details
drywall repair and replacment in 3 areas- bedroom, bathroom, kitchen. install new kitchen cabinets and counter top. replace sink, toilet, and bath tub, sink- in bathroom. paint. | $48,800 |
| Dec 17, 2015 | Completed final sign-off Apr 2016 | 1250 Clay St | unit 204: remove & install new kitchen cabinet, remodel bathroom. install light fixt.Details
unit 204: remove & install new kitchen cabinet, remodel bathroom. install light fixt. | $16,000 |
| Sep 11, 2015 | Completed final sign-off Dec 2015 | 1746 Bryant St | add bathroom and kitchen remodel.Details
add bathroom and kitchen remodel. | $12,000 |
| Jun 24, 2015 | Completed final sign-off May 2016 | 817 Oak St | general renovation of 1st story to include regrading for increased ceiling height, nw stepped fndations, slabs, nfpa 13 sprinkler system kitchen, wndws, doors, mech, plmg, electrical, finishes and fixture. new internal stair connectin 1st & 2nd story. relocate 2nd flr kitchn to 1st to create 2ndDetails
general renovation of 1st story to include regrading for increased ceiling height, nw stepped fndations, slabs, nfpa 13 sprinkler system kitchen, wndws, doors, mech, plmg, electrical, finishes and fixture. new internal stair connectin 1st & 2nd story. relocate 2nd flr kitchn to 1st to create 2nd | $25,000 |
| May 18, 2015 | Completed final sign-off Jul 2015 | 175 Bright St | to comply with nov 201532223. correct non-compliant kitchen remodel without permit at second floor only. all work in kind.Details
to comply with nov 201532223. correct non-compliant kitchen remodel without permit at second floor only. all work in kind. | $2,500 |
| Apr 8, 2014 | Never finaled issued Apr 2014, no final | 249 Gennessee St | kitchen remodel, floor replace, replace cabinets. no structural work.Details
kitchen remodel, floor replace, replace cabinets. no structural work. | $15,000 |
| Mar 24, 2014 | Completed final sign-off Jun 2014 | 136 Broad St | kitchen remodel, cabinets & counter tops.Details
kitchen remodel, cabinets & counter tops. | $9,000 |