Genesis Residential Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2016 to Oct 2024
- Last 24 months
- 1 permit filed
16 permits since 2000: 13 completed, 1 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 1 days from filing to permit and 254 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 7, 2019 | Completed final sign-off Sep 2019 | 616 Carolina St | alter dimension of beam from (hss 8x2x 1/4) to (hss 8x6x 1/4) and relocate (hss 3x3x 3/8) post at grid line a-4/ 1.5 on 1st level from base of stairs to inside south wall at end of beam mentioned above. ref app#201211214670 and 201609278905Details
alter dimension of beam from (hss 8x2x 1/4) to (hss 8x6x 1/4) and relocate (hss 3x3x 3/8) post at grid line a-4/ 1.5 on 1st level from base of stairs to inside south wall at end of beam mentioned above. ref app#201211214670 and 201609278905 |