Back to bathroom remodel contractors
Genesis Residential Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2016 to Oct 2024
- Last 24 months
- 1 permit filed
16 permits since 2000: 13 completed, 1 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 0 days from filing to permit and 192 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 27, 2024 | Completed final sign-off May 2025 | 2721 Union St | remodel 2 existing bathrooms. presently master bathroom to be converted from tub to shower, guest bathroom gets replaced tub. no additional water or electrical demands, new shower, tub, tiles. lights. vent/ fans, vanity cabinets, toilets. each bathroom approx 60sq ft. no increase in sq footage.Details
remodel 2 existing bathrooms. presently master bathroom to be converted from tub to shower, guest bathroom gets replaced tub. no additional water or electrical demands, new shower, tub, tiles. lights. vent/ fans, vanity cabinets, toilets. each bathroom approx 60sq ft. no increase in sq footage. | $75,000 |
| Jun 2, 2023 | Completed final sign-off Sep 2023 | 218 26th Av | master bathroom remodel remove tub and convert to walk in shower, with prefab shower pan new tile on walls floor new vanity relocate plumbing, toliet stay in (e) remove (e) lights replace with in celining led fixtures, remove door, install pocket door, one additonal outletDetails
master bathroom remodel remove tub and convert to walk in shower, with prefab shower pan new tile on walls floor new vanity relocate plumbing, toliet stay in (e) remove (e) lights replace with in celining led fixtures, remove door, install pocket door, one additonal outlet | $30,000 |