Permit GraphShortlistSan Francisco building permits since 2000

Genesis Residential Construction

Contractor license
1041113
State license record
Based in
San Francisco
On San Francisco permits
Sep 2016 to Oct 2024
Last 24 months
1 permit filed

16 permits since 2000: 13 completed, 1 in progress, 1 never finaled, 1 expired or cancelled.

Of the 1 never-finaled permit, 1 is 3 to 5 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Bathroom remodel permits

AllDeck 1Stairs 1Kitchen remodel 1Bathroom remodel 2

2 bathroom remodel permits: 2 completed. Typically 0 days from filing to permit and 192 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Aug 27, 2024Completed
final sign-off May 2025
2721 Union Stremodel 2 existing bathrooms. presently master bathroom to be converted from tub to shower, guest bathroom gets replaced tub. no additional water or electrical demands, new shower, tub, tiles. lights. vent/ fans, vanity cabinets, toilets. each bathroom approx 60sq ft. no increase in sq footage.
Details
Permit
202408279524
Status
complete
Filed
Aug 27, 2024
Permit issued
Aug 27, 2024
Final sign-off
May 23, 2025
Declared cost
$75,000
Address
2721 Union St

remodel 2 existing bathrooms. presently master bathroom to be converted from tub to shower, guest bathroom gets replaced tub. no additional water or electrical demands, new shower, tub, tiles. lights. vent/ fans, vanity cabinets, toilets. each bathroom approx 60sq ft. no increase in sq footage.

Open the permit page

$75,000
Jun 2, 2023Completed
final sign-off Sep 2023
218 26th Avmaster bathroom remodel remove tub and convert to walk in shower, with prefab shower pan new tile on walls floor new vanity relocate plumbing, toliet stay in (e) remove (e) lights replace with in celining led fixtures, remove door, install pocket door, one additonal outlet
Details
Permit
202306029093
Status
complete
Filed
Jun 2, 2023
Permit issued
Jun 2, 2023
Final sign-off
Sep 26, 2023
Declared cost
$30,000
Address
218 26th Av

master bathroom remodel remove tub and convert to walk in shower, with prefab shower pan new tile on walls floor new vanity relocate plumbing, toliet stay in (e) remove (e) lights replace with in celining led fixtures, remove door, install pocket door, one additonal outlet

Open the permit page

$30,000