Gene Peterson General Contractor
- Based in
- Vallejo
- On San Francisco permits
- Jan 2001 to Sep 2016
- Last 24 months
- 0 permits filed
36 permits since 2000: 25 completed, 2 never finaled, 9 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
2 roof deck permits: 2 completed. Typically 92 days from filing to permit and 244 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 15, 2014 | Completed final sign-off Jan 2014 | 875 Wisconsin St | replace guard railing around upper roof deck. bringing it up from existing 34" to 42" through bolting 4x4 post into rim joist - repair (e) siding at back of house where it has dry rot and deteriorated. replace inkind as neededDetails
replace guard railing around upper roof deck. bringing it up from existing 34" to 42" through bolting 4x4 post into rim joist - repair (e) siding at back of house where it has dry rot and deteriorated. replace inkind as needed | $15,000 |
| Jun 7, 2007 | Completed final sign-off Mar 2009 | 2033 Baker St | new 1 story rear yard additon with roof deck. remodel kitchenDetails
new 1 story rear yard additon with roof deck. remodel kitchen | $48,000 |