Back to bathroom remodel contractors
Gene Peterson General Contractor
- Based in
- Vallejo
- On San Francisco permits
- Jan 2001 to Sep 2016
- Last 24 months
- 0 permits filed
36 permits since 2000: 25 completed, 2 never finaled, 9 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
11 bathroom remodel permits: 9 completed, 2 expired or cancelled. Typically 0 days from filing to permit and 236 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 8, 2016 | Completed final sign-off May 2017 | 71 Rosenkranz St | remodel 2nd & 3rd stories of existing 3-story residence. finish upgrades throughout. reconfigure existing two bathrooms and kitchen. upgrade and replace windows.Details
remodel 2nd & 3rd stories of existing 3-story residence. finish upgrades throughout. reconfigure existing two bathrooms and kitchen. upgrade and replace windows. | $270,000 |
| Dec 21, 2015 | Completed final sign-off Mar 2016 | 2409 Scott St | unit #2 - update fixtures in bathroom, remove bathtub replace with tile marble shower, replace old single glass double hung window with new mar double hung. add space for waher & dryer, chang e(e) closet , removing non-bearing wall back of closet, add dual door into new closet pant, add tile floors.Details
unit #2 - update fixtures in bathroom, remove bathtub replace with tile marble shower, replace old single glass double hung window with new mar double hung. add space for waher & dryer, chang e(e) closet , removing non-bearing wall back of closet, add dual door into new closet pant, add tile floors. | $18,000 |
| Jun 30, 2015 | Completed final sign-off Mar 2016 | 71 Rosenkranz St | remodel to 1st floor only - new multipurpose family room & new bath. partial seismic work, new header @ rear new opening, new rear deck less than 30" above grade. no expansion of (e) footprint of building.Details
remodel to 1st floor only - new multipurpose family room & new bath. partial seismic work, new header @ rear new opening, new rear deck less than 30" above grade. no expansion of (e) footprint of building. | $50,000 |
| Jan 14, 2013 | Completed final sign-off Dec 2013 | 601 Van Ness Av | remodel bathroom - new wood flooring, re-build interior closet doors, new tile floors, add lights in bedroom. no structural work. comply with cec 150(k) lighting requirements.Details
remodel bathroom - new wood flooring, re-build interior closet doors, new tile floors, add lights in bedroom. no structural work. comply with cec 150(k) lighting requirements. | $11,000 |
| Apr 20, 2012 | Completed final sign-off Oct 2012 | 2121 Jackson St | remodel 2 bathrooms, one in kind with all new fixture. 2nd bath move toilet to achive 30' space and relocate lavi and relocate bath door all new tile valves and finishes on the 3rd floor.Details
remodel 2 bathrooms, one in kind with all new fixture. 2nd bath move toilet to achive 30' space and relocate lavi and relocate bath door all new tile valves and finishes on the 3rd floor. | $27,500 |
| Mar 4, 2011 | Completed final sign-off Dec 2011 | 1998 Broadway | 9th floor, unit 905 - kitchen and three bathrooms remodel in-kind. non-bearing partition removal between kitchen and living room & 3rd bedroom. convert 3rd bath to landry room.Details
9th floor, unit 905 - kitchen and three bathrooms remodel in-kind. non-bearing partition removal between kitchen and living room & 3rd bedroom. convert 3rd bath to landry room. | $15,500 |
| May 3, 2010 | Completed final sign-off Mar 2011 | 601 Van Ness Av | unit 1025- 1oth fl. remodel kitchen and bathrooms. new cabinets, counters, plumbing fixtures. no wall removalDetails
unit 1025- 1oth fl. remodel kitchen and bathrooms. new cabinets, counters, plumbing fixtures. no wall removal | $30,000 |
| Jul 18, 2007 | Expired or cancelled expired Feb 2010 | 2391 Filbert St | work on #2391. received permit for kitchen remodel on 06/08/07. pa#200706083441. during demolition found (e) floor joists were cut 4" to accomodate plumging for 3rd fl bathroom. we are proposing to strenthen (e) floor joists remove (e) plumbing and re arrange & replace 3rd fl bathroom fixtures toDetails
work on #2391. received permit for kitchen remodel on 06/08/07. pa#200706083441. during demolition found (e) floor joists were cut 4" to accomodate plumging for 3rd fl bathroom. we are proposing to strenthen (e) floor joists remove (e) plumbing and re arrange & replace 3rd fl bathroom fixtures to | $25,000 |
| May 1, 2006 | Expired or cancelled expired Apr 2010 | 236 Guerrero St | remodel existing bathroom new shower toilet and lavi including new exhaust fan and lightsDetails
remodel existing bathroom new shower toilet and lavi including new exhaust fan and lights | $15,000 |
| May 17, 2005 | Completed final sign-off Nov 2005 | 257 Page St | replace kitchen/bath windows less than '3 - 0" from p.l. & same size location, remodel existing ktchDetails
replace kitchen/bath windows less than '3 - 0" from p.l. & same size location, remodel existing ktch | $18,000 |
| May 17, 2005 | Completed final sign-off Jan 2006 | 25 Jade Pl | bathroom remodel- replace (e) fixtures with new (n) toilet, cabinets, & shower/bathDetails
bathroom remodel- replace (e) fixtures with new (n) toilet, cabinets, & shower/bath | $12,000 |