Back to kitchen remodel contractors
Gene K. Ng Construction
- Based in
- Oakland
- On San Francisco permits
- Dec 2000 to May 2014
- Last 24 months
- 0 permits filed
14 permits since 2000: 12 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
6 kitchen remodel permits: 5 completed, 1 never finaled. Typically 1 days from filing to permit and 168 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 21, 2014 | Completed final sign-off Apr 2014 | 1167 Pine St | comply with nove 201335271, 201337061, 201344091. remove and all excessive combustible material throughout units. refinish wood flooring in kitchen, provide new cabinet, countertop, sink and plumbing. replace lights. painted whole unit. replace heater in #4 & #7.Details
comply with nove 201335271, 201337061, 201344091. remove and all excessive combustible material throughout units. refinish wood flooring in kitchen, provide new cabinet, countertop, sink and plumbing. replace lights. painted whole unit. replace heater in #4 & #7. | $20,000 |
| Nov 5, 2012 | Completed final sign-off Apr 2013 | 16 Saint Charles Av | to comply w/nov #201261581: to remove illegal countertop & kitchen sink and revert back to last legal use - laundry.Details
to comply w/nov #201261581: to remove illegal countertop & kitchen sink and revert back to last legal use - laundry. | $1,000 |
| Oct 31, 2012 | Completed final sign-off May 2014 | 120 Paloma Av | at 1st fl: expand e bedrooms, playroom, and relocate laundry and new water heater and furnace at 2nd fl. new full bath and remodel e kitchen and bath. replace e deteriorated foundation in kin. repair e deteriorated stairDetails
at 1st fl: expand e bedrooms, playroom, and relocate laundry and new water heater and furnace at 2nd fl. new full bath and remodel e kitchen and bath. replace e deteriorated foundation in kin. repair e deteriorated stair | $50,000 |
| Jul 15, 2011 | Completed final sign-off Oct 2011 | 2442 35th Av | remodel kitchen, replace cabinets, kitchen sink, replace electrical outlets and lights. no new lighting, no structural work. provide carbon monoxide detector per bldg code.Details
remodel kitchen, replace cabinets, kitchen sink, replace electrical outlets and lights. no new lighting, no structural work. provide carbon monoxide detector per bldg code. | $6,000 |
| Aug 23, 2010 | Never finaled issued Aug 2010, no final | 2739 Franklin St | replace cabinets, countertop, tile. update electrical for kitchen area with new receptacles and lights and new appliance. min. 50% of kitchen light watts shall be of h.e. lights per cec 180(k)Details
replace cabinets, countertop, tile. update electrical for kitchen area with new receptacles and lights and new appliance. min. 50% of kitchen light watts shall be of h.e. lights per cec 180(k) | $2,000 |
| Jan 6, 2009 | Completed final sign-off Dec 2009 | 145 Madrone Av | add family room, bath & bedroom @ 1st floor; kitchen & bath remodel & relocate stairs @ 2nd floor; remodel bath, add new bath w/closet @ 3rd floor; new structural beams & voluntary plywood strengthening.Details
add family room, bath & bedroom @ 1st floor; kitchen & bath remodel & relocate stairs @ 2nd floor; remodel bath, add new bath w/closet @ 3rd floor; new structural beams & voluntary plywood strengthening. | $60,000 |