Back to bathroom remodel contractors
Gene K. Ng Construction
- Based in
- Oakland
- On San Francisco permits
- Dec 2000 to May 2014
- Last 24 months
- 0 permits filed
14 permits since 2000: 12 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 4 completed. Typically 4 days from filing to permit and 216 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 31, 2012 | Completed final sign-off May 2014 | 120 Paloma Av | at 1st fl: expand e bedrooms, playroom, and relocate laundry and new water heater and furnace at 2nd fl. new full bath and remodel e kitchen and bath. replace e deteriorated foundation in kin. repair e deteriorated stairDetails
at 1st fl: expand e bedrooms, playroom, and relocate laundry and new water heater and furnace at 2nd fl. new full bath and remodel e kitchen and bath. replace e deteriorated foundation in kin. repair e deteriorated stair | $50,000 |
| Jul 27, 2010 | Completed final sign-off Oct 2010 | 454 Edinburgh St | remove (e) illegal bedroom atgarage floor. add two new bedrooms, two full bathrooms, two storage rooms at garage floor.Details
remove (e) illegal bedroom atgarage floor. add two new bedrooms, two full bathrooms, two storage rooms at garage floor. | $30,000 |
| Jan 6, 2009 | Completed final sign-off Dec 2009 | 145 Madrone Av | add family room, bath & bedroom @ 1st floor; kitchen & bath remodel & relocate stairs @ 2nd floor; remodel bath, add new bath w/closet @ 3rd floor; new structural beams & voluntary plywood strengthening.Details
add family room, bath & bedroom @ 1st floor; kitchen & bath remodel & relocate stairs @ 2nd floor; remodel bath, add new bath w/closet @ 3rd floor; new structural beams & voluntary plywood strengthening. | $60,000 |
| Feb 25, 2003 | Completed final sign-off Jun 2003 | 269 Saint Charles Av | add family room one bedroom one bathroom and one laundry room on g/fDetails
add family room one bedroom one bathroom and one laundry room on g/f | $25,000 |