Back to kitchen remodel contractors
Gary Liu Construction (Ask For Id)
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Jan 2019
- Last 24 months
- 0 permits filed
42 permits since 2000: 38 completed, 1 never finaled, 3 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
9 kitchen remodel permits: 9 completed. Typically 0 days from filing to permit and 116 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 14, 2019 | Completed final sign-off Oct 2019 | 1448 Willard St | remodel 1 kitchen and 3 bathrooms. all to be replaced in-kind.Details
remodel 1 kitchen and 3 bathrooms. all to be replaced in-kind. | $120,000 |
| Jun 20, 2013 | Completed final sign-off Aug 2013 | 8 Waterville St | legalize ground floor to have 1 bedroom, 1 family room, 1 storage & 1 full bathroom, remove illegal kitchen on ground floor. in response to comply with 201307502Details
legalize ground floor to have 1 bedroom, 1 family room, 1 storage & 1 full bathroom, remove illegal kitchen on ground floor. in response to comply with 201307502 | $38,000 |
| Nov 5, 2012 | Completed final sign-off Mar 2013 | 2156 Jones St | 3rd floor; remodeling one kitchen and one bathroomDetails
3rd floor; remodeling one kitchen and one bathroom | $7,000 |
| Sep 10, 2012 | Completed final sign-off Jan 2014 | 238 Paris St | comply with nov# 201169853 dated 12/2/11-demolish 2 illegal kitchens, 1 on ground floor & 1 on 2nd floor. legalize (e) habitable space on ground floor (1 bedrom, 1 family room, 1 bathroom & 1 walk-in lcoset. legalize habitable spaces at ground & 3rd floorDetails
comply with nov# 201169853 dated 12/2/11-demolish 2 illegal kitchens, 1 on ground floor & 1 on 2nd floor. legalize (e) habitable space on ground floor (1 bedrom, 1 family room, 1 bathroom & 1 walk-in lcoset. legalize habitable spaces at ground & 3rd floor | $16,000 |
| May 11, 2012 | Completed final sign-off Sep 2012 | 330 05th Av | remodel (e) kitchen, (e) bath, relocate living room,bedrooms, add new bath on 3rd floor unit 330. replace (e) water heater and (e) furnaceDetails
remodel (e) kitchen, (e) bath, relocate living room,bedrooms, add new bath on 3rd floor unit 330. replace (e) water heater and (e) furnace | $30,000 |
| Dec 9, 2010 | Completed final sign-off Nov 2011 | 2587 33rd Av | remodel kitchen: remove the old cabinet, install new cabinet, new countertop, new floor tile, upgrade new lights & outlets. kitchen remodel only, at least 50% high efficacy lighting (by wattage).Details
remodel kitchen: remove the old cabinet, install new cabinet, new countertop, new floor tile, upgrade new lights & outlets. kitchen remodel only, at least 50% high efficacy lighting (by wattage). | $8,000 |
| Oct 22, 2010 | Completed final sign-off Jan 2011 | 2304 Clement St | remodel e kitchen, modify 1 e bedroom, add 1 new bath. all work on e 2nd fl unit 2304.Details
remodel e kitchen, modify 1 e bedroom, add 1 new bath. all work on e 2nd fl unit 2304. | $20,000 |
| Oct 3, 2005 | Completed final sign-off Oct 2005 | 73 Saturn St | 1 kitchen remodelDetails
1 kitchen remodel | $7,500 |
| Mar 5, 2001 | Completed final sign-off Jun 2001 | 31 Italy Av | replace kitchen cabinets no stuctural changesDetails
replace kitchen cabinets no stuctural changes | $5,000 |