Back to bathroom remodel contractors
Gary Liu Construction (Ask For Id)
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Jan 2019
- Last 24 months
- 0 permits filed
42 permits since 2000: 38 completed, 1 never finaled, 3 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
17 bathroom remodel permits: 15 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 116 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 14, 2019 | Completed final sign-off Oct 2019 | 1448 Willard St | remodel 1 kitchen and 3 bathrooms. all to be replaced in-kind.Details
remodel 1 kitchen and 3 bathrooms. all to be replaced in-kind. | $120,000 |
| Mar 3, 2016 | Never finaled issued Mar 2016, no final | 1388 45th Av | add 2 office spaces, media room, one full bath, one half bath @ 1st floor.Details
add 2 office spaces, media room, one full bath, one half bath @ 1st floor. | $80,000 |
| Jul 25, 2013 | Completed final sign-off Jun 2014 | 1669 Sacramento St | repair bathroom, install tiles on bathroom wall. paint back yard wall.Details
repair bathroom, install tiles on bathroom wall. paint back yard wall. | $5,000 |
| Jun 20, 2013 | Completed final sign-off Aug 2013 | 8 Waterville St | legalize ground floor to have 1 bedroom, 1 family room, 1 storage & 1 full bathroom, remove illegal kitchen on ground floor. in response to comply with 201307502Details
legalize ground floor to have 1 bedroom, 1 family room, 1 storage & 1 full bathroom, remove illegal kitchen on ground floor. in response to comply with 201307502 | $38,000 |
| Nov 5, 2012 | Completed final sign-off Mar 2013 | 2156 Jones St | 3rd floor; remodeling one kitchen and one bathroomDetails
3rd floor; remodeling one kitchen and one bathroom | $7,000 |
| Sep 14, 2012 | Expired or cancelled expired Mar 2016 | 3500 Ocean Av | excavate +/- 4ft earth at e crawl space for new playroom, bedroom, study and bathsDetails
excavate +/- 4ft earth at e crawl space for new playroom, bedroom, study and baths | $60,000 |
| Sep 10, 2012 | Completed final sign-off Jan 2014 | 238 Paris St | comply with nov# 201169853 dated 12/2/11-demolish 2 illegal kitchens, 1 on ground floor & 1 on 2nd floor. legalize (e) habitable space on ground floor (1 bedrom, 1 family room, 1 bathroom & 1 walk-in lcoset. legalize habitable spaces at ground & 3rd floorDetails
comply with nov# 201169853 dated 12/2/11-demolish 2 illegal kitchens, 1 on ground floor & 1 on 2nd floor. legalize (e) habitable space on ground floor (1 bedrom, 1 family room, 1 bathroom & 1 walk-in lcoset. legalize habitable spaces at ground & 3rd floor | $16,000 |
| May 11, 2012 | Completed final sign-off Sep 2012 | 330 05th Av | remodel (e) kitchen, (e) bath, relocate living room,bedrooms, add new bath on 3rd floor unit 330. replace (e) water heater and (e) furnaceDetails
remodel (e) kitchen, (e) bath, relocate living room,bedrooms, add new bath on 3rd floor unit 330. replace (e) water heater and (e) furnace | $30,000 |
| Apr 11, 2012 | Completed final sign-off Jul 2012 | 812 Madrid St | response to complaint 201210681 t legalize gr floor to have 2 bedrooms, 1 full bath and storageDetails
response to complaint 201210681 t legalize gr floor to have 2 bedrooms, 1 full bath and storage | $28,000 |
| Jan 18, 2012 | Completed final sign-off Mar 2012 | 472 Gaven St | construct one (n) bath, one (n) office, & (n) exercise room on basement floor.Details
construct one (n) bath, one (n) office, & (n) exercise room on basement floor. | $20,000 |
| May 20, 2011 | Completed final sign-off Sep 2011 | 1321 19th Av | construct 2 new bedrooms, 1 bathroom, 1 new laundry room on ground floor. replace (e) water heater & (e) furnace, repair (e) exterior stair at rear yard in kindDetails
construct 2 new bedrooms, 1 bathroom, 1 new laundry room on ground floor. replace (e) water heater & (e) furnace, repair (e) exterior stair at rear yard in kind | $35,000 |
| Oct 22, 2010 | Completed final sign-off Jan 2011 | 2304 Clement St | remodel e kitchen, modify 1 e bedroom, add 1 new bath. all work on e 2nd fl unit 2304.Details
remodel e kitchen, modify 1 e bedroom, add 1 new bath. all work on e 2nd fl unit 2304. | $20,000 |
| Aug 17, 2010 | Completed final sign-off Nov 2010 | 1264 45th Av | comply with physical inspection report cc-5587 for legalizing 1/2 bath on gr levelDetails
comply with physical inspection report cc-5587 for legalizing 1/2 bath on gr level | $5,000 |
| Jul 2, 2010 | Completed final sign-off Dec 2010 | 810 47th Av | construct 1 new bedroom, 2 bathrooms, 1 laundry area, 1 exercise area on ground floor. replace (e) water heater & (e) furnaceDetails
construct 1 new bedroom, 2 bathrooms, 1 laundry area, 1 exercise area on ground floor. replace (e) water heater & (e) furnace | $38,000 |
| Jun 15, 2010 | Completed final sign-off Dec 2010 | 52 Forest View Dr | construct two (n) bedrooms, one (n) bathroom, & one (n) laundry area on (e) ground flr. replace (e) water heater & (e) furnace.Details
construct two (n) bedrooms, one (n) bathroom, & one (n) laundry area on (e) ground flr. replace (e) water heater & (e) furnace. | $38,000 |
| Apr 9, 2010 | Completed final sign-off Aug 2010 | 2198 31st Av | construct 3 new bedrooms, two new full bathrooms and new laundry area on ground floor. replace (e) water heater and (e) furnace. replace (e) foundation at south sideDetails
construct 3 new bedrooms, two new full bathrooms and new laundry area on ground floor. replace (e) water heater and (e) furnace. replace (e) foundation at south side | $50,000 |
| Aug 11, 2006 | Completed final sign-off Nov 2006 | 148 Hancock St | remodel (e) bathroom, no structural workDetails
remodel (e) bathroom, no structural work | $3,000 |