Gary Construction Company *Check I.D.*
- Based in
- Milbrae
- On San Francisco permits
- Jan 2001 to Jan 2013
- Last 24 months
- 0 permits filed
37 permits since 2000: 34 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 3 completed. Typically 55 days from filing to permit and 394 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 25, 2009 | Completed final sign-off Jan 2010 | 1123 Powell St | replace front stairway in kind. reinforce foundation at crawlspace.Details
replace front stairway in kind. reinforce foundation at crawlspace. | $45,000 |
| May 1, 2008 | Completed final sign-off Jul 2009 | 1322 Funston Av | remodel (e) bathrooms, add one bathroom on the upper level,new roof deck, add two bathrooms, two bedrooms, one family room at garage level. repair dry rot.new stairs to garage level. comply with complaint #200853618Details
remodel (e) bathrooms, add one bathroom on the upper level,new roof deck, add two bathrooms, two bedrooms, one family room at garage level. repair dry rot.new stairs to garage level. comply with complaint #200853618 | $23,000 |
| Jan 19, 2001 | Completed final sign-off Jun 2003 | 1275 Athens St | new 3rd story addition two bedrm two bath study rm one den & new stairsDetails
new 3rd story addition two bedrm two bath study rm one den & new stairs | $120,000 |