Back to bathroom remodel contractors
Gary Construction Company *Check I.D.*
- Based in
- Milbrae
- On San Francisco permits
- Jan 2001 to Jan 2013
- Last 24 months
- 0 permits filed
37 permits since 2000: 34 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
15 bathroom remodel permits: 14 completed, 1 expired or cancelled. Typically 2 days from filing to permit and 140 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 3, 2011 | Completed final sign-off Jan 2012 | 104 Moneta Wy | to add two bedrooms, one full bathroom, one laundry room, hall on (e) ground floor per plan.Details
to add two bedrooms, one full bathroom, one laundry room, hall on (e) ground floor per plan. | $40,000 |
| Aug 27, 2010 | Completed final sign-off Dec 2010 | 2055 Carroll Av | 1st floor (garage)-add 1 bedroom, 1 family room, 1 study room, add 2 full bathrooms. new furnaces, water heater & washer/dryerDetails
1st floor (garage)-add 1 bedroom, 1 family room, 1 study room, add 2 full bathrooms. new furnaces, water heater & washer/dryer | $35,000 |
| Aug 19, 2009 | Completed final sign-off Dec 2009 | 82 Florentine Av | add two bedrooms, two storage rooms & two bathrooms on first floor. to enclose area on first floor per plan.Details
add two bedrooms, two storage rooms & two bathrooms on first floor. to enclose area on first floor per plan. | $35,000 |
| May 12, 2009 | Completed final sign-off Oct 2009 | 1466 35th Av | 1)to add 2 bed room , 2 full bathroom and one storage on extg ground floor per plan. 2)remove extg post "p1" and beam above (see extg ground floor plan) provede new post footing and bearing wall footings per plan.Details
1)to add 2 bed room , 2 full bathroom and one storage on extg ground floor per plan. 2)remove extg post "p1" and beam above (see extg ground floor plan) provede new post footing and bearing wall footings per plan. | $50,000 |
| May 1, 2008 | Completed final sign-off Jul 2009 | 1322 Funston Av | remodel (e) bathrooms, add one bathroom on the upper level,new roof deck, add two bathrooms, two bedrooms, one family room at garage level. repair dry rot.new stairs to garage level. comply with complaint #200853618Details
remodel (e) bathrooms, add one bathroom on the upper level,new roof deck, add two bathrooms, two bedrooms, one family room at garage level. repair dry rot.new stairs to garage level. comply with complaint #200853618 | $23,000 |
| Apr 21, 2008 | Completed final sign-off Oct 2010 | 4252 22nd St | horizontal addition at existing 3rd level: new master bedroom and bath, new 2nd bedroom, expansion of (e) bathroom, 2 new windows, 3 new closets, 4 new skylights. 2nd level: new deck off kitchen area. (horizontal addition) 1st level: relocate door at rear yard access.Details
horizontal addition at existing 3rd level: new master bedroom and bath, new 2nd bedroom, expansion of (e) bathroom, 2 new windows, 3 new closets, 4 new skylights. 2nd level: new deck off kitchen area. (horizontal addition) 1st level: relocate door at rear yard access. | $110,000 |
| Apr 11, 2008 | Completed final sign-off Dec 2008 | 2535 37th Av | add 2 bedrooms and 2 bathrooms at ground level. add 3 new windowsDetails
add 2 bedrooms and 2 bathrooms at ground level. add 3 new windows | $23,000 |
| Aug 27, 2007 | Completed final sign-off Feb 2010 | 734 Rivera St | 2 story horizontal addition at north west corner of existing bldg add one more garage at ground floor, a master bedroom with office bath and closet 2nd floorDetails
2 story horizontal addition at north west corner of existing bldg add one more garage at ground floor, a master bedroom with office bath and closet 2nd floor | $40,000 |
| Jul 5, 2007 | Completed final sign-off Mar 2008 | 3240 Ulloa St | add a family room, bedroom, bathroom, and laundry room in existing ground floor. (garage) replace e window at rearDetails
add a family room, bedroom, bathroom, and laundry room in existing ground floor. (garage) replace e window at rear | $15,000 |
| Jun 28, 2007 | Completed final sign-off Oct 2007 | 145 Paraiso Pl | grd fl-add master bedroom, full bath & laundry room. convert toilet rom to full bath. 2nd fl-new open between breakfast and kitchen remodel existing bathroom.Details
grd fl-add master bedroom, full bath & laundry room. convert toilet rom to full bath. 2nd fl-new open between breakfast and kitchen remodel existing bathroom. | $60,000 |
| Mar 30, 2006 | Completed final sign-off May 2006 | 1463 33rd Av | bathroom remodel. remove bathroom wall. floor tiles. install new tiles, sink, toilet. no strucctural work.Details
bathroom remodel. remove bathroom wall. floor tiles. install new tiles, sink, toilet. no strucctural work. | $6,315 |
| Mar 14, 2006 | Completed final sign-off Jul 2006 | 1851 27th Av | revision to appl#200601182417 per ground floor plan. change bath tub location. change closet size, (n) window size in bedroom.Details
revision to appl#200601182417 per ground floor plan. change bath tub location. change closet size, (n) window size in bedroom. | |
| Mar 16, 2005 | Completed final sign-off Jun 2005 | 2174 48th Av | construct 1 story deck (8'-0" ht) at rear of (e) building. to add 1 bedroom. 1 full bath room.Details
construct 1 story deck (8'-0" ht) at rear of (e) building. to add 1 bedroom. 1 full bath room. | $18,000 |
| Feb 10, 2005 | Expired or cancelled expired Jan 2006 | 224 Niagara Av | remodel kitchen & bathroom.kitchen-replace cabinets,sink.bath-replace toilet,sink,floor covering,Details
remodel kitchen & bathroom.kitchen-replace cabinets,sink.bath-replace toilet,sink,floor covering, | $10,000 |
| Jan 19, 2001 | Completed final sign-off Jun 2003 | 1275 Athens St | new 3rd story addition two bedrm two bath study rm one den & new stairsDetails
new 3rd story addition two bedrm two bath study rm one den & new stairs | $120,000 |