Gan Poy Ng Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2001 to Apr 2019
- Last 24 months
- 0 permits filed
53 permits since 2000: 46 completed, 3 never finaled, 4 expired or cancelled.
Of the 3 never-finaled permits, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
8 stairs permits: 7 completed, 1 never finaled. Typically 0 days from filing to permit and 11 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 2, 2018 | Completed final sign-off Apr 2018 | 1755 07th Av | fix dry rot on stairway & handrail in rear exterior, less than 50%Details
fix dry rot on stairway & handrail in rear exterior, less than 50% | $6,000 |
| Apr 25, 2017 | Completed final sign-off Feb 2018 | 1830 Noriega St | revision to app#201610049499: replace extg interior staircase per plan. 2)add one powder room on 1st floor per plan. 3)replace extg window to french door at front of bldg on 2nd floor per plan.Details
revision to app#201610049499: replace extg interior staircase per plan. 2)add one powder room on 1st floor per plan. 3)replace extg window to french door at front of bldg on 2nd floor per plan. | $15,000 |
| Oct 4, 2016 | Never finaled issued Dec 2016, no final | 1830 Noriega St | eliminate (e) light wells on both side of bldg on 1/f, turn (e) storage into mudroom, replace (e) interior stair with spiral staircase, re-configure 1/f layout, add on efull bathroom on 1/f. replace 8 windows, replace 3 sliding doors, full bathroom in basementDetails
eliminate (e) light wells on both side of bldg on 1/f, turn (e) storage into mudroom, replace (e) interior stair with spiral staircase, re-configure 1/f layout, add on efull bathroom on 1/f. replace 8 windows, replace 3 sliding doors, full bathroom in basement | $40,000 |
| Sep 6, 2016 | Completed final sign-off Sep 2016 | 1825 Wawona St | replace stairway on side of house in kind less than 50%Details
replace stairway on side of house in kind less than 50% | $1,500 |
| Sep 28, 2015 | Completed final sign-off Oct 2015 | 1324 Haight St | fix landing at exterior stairway located at the mid length of buildingDetails
fix landing at exterior stairway located at the mid length of building | $1,000 |
| May 5, 2008 | Completed final sign-off May 2008 | 931 Steiner St | repair front stairs in kind, less than 50%.Details
repair front stairs in kind, less than 50%. | $3,500 |
| Feb 4, 2008 | Completed final sign-off Feb 2008 | 2504 Sutter St | repair rear stairs in kind less than 50%.Details
repair rear stairs in kind less than 50%. | $4,000 |
| Dec 17, 2007 | Completed final sign-off Jan 2008 | 931 Steiner St | 931 repair rear exterior stairs in kind, less than 50% repair of rear deck.Details
931 repair rear exterior stairs in kind, less than 50% repair of rear deck. | $4,000 |