Back to bathroom remodel contractors
Gan Poy Ng Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2001 to Apr 2019
- Last 24 months
- 0 permits filed
53 permits since 2000: 46 completed, 3 never finaled, 4 expired or cancelled.
Of the 3 never-finaled permits, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
14 bathroom remodel permits: 13 completed, 1 never finaled. Typically 0 days from filing to permit and 56 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 4, 2016 | Never finaled issued Dec 2016, no final | 1830 Noriega St | eliminate (e) light wells on both side of bldg on 1/f, turn (e) storage into mudroom, replace (e) interior stair with spiral staircase, re-configure 1/f layout, add on efull bathroom on 1/f. replace 8 windows, replace 3 sliding doors, full bathroom in basementDetails
eliminate (e) light wells on both side of bldg on 1/f, turn (e) storage into mudroom, replace (e) interior stair with spiral staircase, re-configure 1/f layout, add on efull bathroom on 1/f. replace 8 windows, replace 3 sliding doors, full bathroom in basement | $40,000 |
| May 9, 2016 | Completed final sign-off Jun 2016 | 82 Valparaiso St | remodel bathroom, bathroom fan, no alteraion of wll, window, door.Details
remodel bathroom, bathroom fan, no alteraion of wll, window, door. | $4,000 |
| Apr 25, 2016 | Completed final sign-off Jun 2016 | 84 Valparaiso St | bathroom remodelDetails
bathroom remodel | $5,000 |
| Feb 16, 2016 | Completed final sign-off Mar 2016 | 3773 24th St | unit b: remodel bathroomDetails
unit b: remodel bathroom | $4,000 |
| Jul 6, 2015 | Completed final sign-off Sep 2015 | 1835 Wawona St | remodel bathroom. replace bathtub with shower at same location. no walls moved, removed or added. all layouts to remain unchanged.Details
remodel bathroom. replace bathtub with shower at same location. no walls moved, removed or added. all layouts to remain unchanged. | $5,000 |
| May 30, 2014 | Completed final sign-off Jul 2014 | 2022 Bancroft Av | revision to pa# 201404254247,. relocate bathroom on 1st floor and add laundry room on 1st floorDetails
revision to pa# 201404254247,. relocate bathroom on 1st floor and add laundry room on 1st floor | |
| Feb 18, 2014 | Completed final sign-off Apr 2014 | 57 Ceres St | 1)add one master bathroom on 2nd floor per plan.Details
1)add one master bathroom on 2nd floor per plan. | $9,000 |
| Sep 13, 2011 | Completed final sign-off Dec 2011 | 676 Silver Av | add 2 bathrooms and 2 bedrooms on existing ground floor per plan.Details
add 2 bathrooms and 2 bedrooms on existing ground floor per plan. | $26,000 |
| Aug 29, 2011 | Completed final sign-off Dec 2011 | 676 Silver Av | (1) kitchen and (1) bathroom remodel. lighting to comply with cec (150) k. no change to windows, walls, and doors.Details
(1) kitchen and (1) bathroom remodel. lighting to comply with cec (150) k. no change to windows, walls, and doors. | $10,000 |
| Nov 10, 2008 | Completed final sign-off Aug 2009 | 2522 Sutter St | remodel 1 kitchen and 1 bathroom. tiles, cabinets.Details
remodel 1 kitchen and 1 bathroom. tiles, cabinets. | $16,000 |
| Nov 10, 2008 | Completed final sign-off Aug 2009 | 2520 Sutter St | remodel 1 kitchen and 1 bathroom. tiles, cabinets new central heat.Details
remodel 1 kitchen and 1 bathroom. tiles, cabinets new central heat. | $16,000 |
| May 8, 2006 | Completed final sign-off Aug 2006 | 2267 30th Av | termite control in front of house, remodel: kitchen, bathroom, counters, cabinets, fixtures, w/c, sink, tub. (approx. 160 sq. ft)Details
termite control in front of house, remodel: kitchen, bathroom, counters, cabinets, fixtures, w/c, sink, tub. (approx. 160 sq. ft) | $8,500 |
| Apr 24, 2006 | Completed final sign-off Apr 2006 | 2504 Sutter St | remodel (1) bathroom only for vent pipe and new toilet no structural workDetails
remodel (1) bathroom only for vent pipe and new toilet no structural work | $1,500 |
| Aug 28, 2003 | Completed final sign-off Sep 2003 | 90 Carr St | remodel (e) bathrooms, change bathtub, toilet & sink, same locations, tile flr & wallsDetails
remodel (e) bathrooms, change bathtub, toilet & sink, same locations, tile flr & walls | $5,000 |