Back to kitchen remodel contractors
Gage Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2016 to Jun 2023
- Last 24 months
- 0 permits filed
24 permits since 2000: 20 completed, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 3 completed. Typically 0 days from filing to permit and 323 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 28, 2020 | Completed final sign-off Sep 2021 | 1211 48th Av | kitchen remodel, replace in-kind. replace cabinets, floors and fixturs. the sink and over will remain inplace. plumbing & electrical sep permits.Details
kitchen remodel, replace in-kind. replace cabinets, floors and fixturs. the sink and over will remain inplace. plumbing & electrical sep permits. | $52,000 |
| Sep 20, 2016 | Completed final sign-off Mar 2017 | 1332 Lake St | remodeling of kitchen to include removing a section of non-load bearing wall between kitchen and dining room,new cabinets, new receptacles, recessed lighting. bathroom remodel to include widening shower door, adding recessed lighting and exhaust fan as well as built in cabinets.Details
remodeling of kitchen to include removing a section of non-load bearing wall between kitchen and dining room,new cabinets, new receptacles, recessed lighting. bathroom remodel to include widening shower door, adding recessed lighting and exhaust fan as well as built in cabinets. | $42,000 |
| Jul 13, 2016 | Completed final sign-off Jun 2017 | 380 Monterey Bl | 3rd flr, #16: kitchen remodel & improvements.addition of lighting in the kitchen &living rm,adding 2 tubular skylights in the kitchen.changing out the cabinets,addition of appliance circuits for elec dryer,add h/c water supply & waste line for dryer & vent.Details
3rd flr, #16: kitchen remodel & improvements.addition of lighting in the kitchen &living rm,adding 2 tubular skylights in the kitchen.changing out the cabinets,addition of appliance circuits for elec dryer,add h/c water supply & waste line for dryer & vent. | $20,000 |