Back to bathroom remodel contractors
Gage Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2016 to Jun 2023
- Last 24 months
- 0 permits filed
24 permits since 2000: 20 completed, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
5 bathroom remodel permits: 5 completed. Typically 0 days from filing to permit and 103 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 22, 2019 | Completed final sign-off Sep 2019 | 654 Vermont St | minor wall removals for new bath entrance. converts stroage space into full bathroomDetails
minor wall removals for new bath entrance. converts stroage space into full bathroom | $36,000 |
| Jan 18, 2019 | Completed final sign-off Mar 2019 | 1855 Sacramento St | bathroom remodel to include new shower and tub fixtures, new tile, and the relocation of the light fixtures. 64 sqft bathroomDetails
bathroom remodel to include new shower and tub fixtures, new tile, and the relocation of the light fixtures. 64 sqft bathroom | $17,000 |
| Jun 20, 2018 | Completed final sign-off Jun 2020 | 570 Bryant St | furring out existing work space walls, replacing the work space and bathroom doors, insulating & drywalling workspace ceiling, restroom ada compliance, mechanical and electrical per plans. fire rating exit. ** maher: n/a **Details
furring out existing work space walls, replacing the work space and bathroom doors, insulating & drywalling workspace ceiling, restroom ada compliance, mechanical and electrical per plans. fire rating exit. ** maher: n/a ** | $94,000 |
| Jul 3, 2017 | Completed final sign-off Sep 2017 | 483 Valley St | 2 structures on lot- 483 valley, single story, w/basement: bathroom remodel, relocation of fixtures, led lighting & receptacles, add tiles to floor/shower walls, repair to drywall as needed.Details
2 structures on lot- 483 valley, single story, w/basement: bathroom remodel, relocation of fixtures, led lighting & receptacles, add tiles to floor/shower walls, repair to drywall as needed. | $31,021 |
| Sep 20, 2016 | Completed final sign-off Mar 2017 | 1332 Lake St | remodeling of kitchen to include removing a section of non-load bearing wall between kitchen and dining room,new cabinets, new receptacles, recessed lighting. bathroom remodel to include widening shower door, adding recessed lighting and exhaust fan as well as built in cabinets.Details
remodeling of kitchen to include removing a section of non-load bearing wall between kitchen and dining room,new cabinets, new receptacles, recessed lighting. bathroom remodel to include widening shower door, adding recessed lighting and exhaust fan as well as built in cabinets. | $42,000 |