G P Construction
- Based in
- Richmond
- On San Francisco permits
- Dec 2019 to Oct 2025
- Last 24 months
- 1 permit filed
4 permits since 2000: 2 completed, 2 never finaled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 0 days from filing to permit and 33 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 15, 2025 | Completed final sign-off Nov 2025 | 1548 Dolores St | repair a portion (less than 50%) of all levels of wood stair tower damaged by dryrot and repaint. stair tower located in rear/side yard and visible from valley street.Details
repair a portion (less than 50%) of all levels of wood stair tower damaged by dryrot and repaint. stair tower located in rear/side yard and visible from valley street. | $18,500 |