Back to kitchen remodel contractors
G P Construction
- Based in
- Richmond
- On San Francisco permits
- Dec 2019 to Oct 2025
- Last 24 months
- 1 permit filed
4 permits since 2000: 2 completed, 2 never finaled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 1 completed, 1 never finaled. Typically 0 days from filing to permit and 55 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 1, 2022 | Completed final sign-off Jan 2023 | 2555 Leavenworth St | kitchen remodeling, bathroom remodeling. install cabinets. electrical subpanel would be relocated. change plumbing valve and shower head.Details
kitchen remodeling, bathroom remodeling. install cabinets. electrical subpanel would be relocated. change plumbing valve and shower head. | $35,000 |
| Dec 4, 2019 | Never finaled issued Dec 2019, no final | 15 Anzavista Av | kitchen remodeling (same layout), electrical, painting.Details
kitchen remodeling (same layout), electrical, painting. | $26,870 |