Back to kitchen remodel contractors
G-Max Construction
- Based in
- San Francisco
- On San Francisco permits
- Nov 2004 to Jul 2021
- Last 24 months
- 0 permits filed
59 permits since 2000: 54 completed, 1 never finaled, 4 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
20 kitchen remodel permits: 19 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 168 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 20, 2021 | Completed final sign-off Nov 2022 | 456 Noe St | remodel kitchen in-kind with new finisehs, appliances and lighting. in bedroom, remove non-load bearing wall and relocate closet.Details
remodel kitchen in-kind with new finisehs, appliances and lighting. in bedroom, remove non-load bearing wall and relocate closet. | $30,000 |
| Jun 26, 2019 | Completed final sign-off Jan 2020 | 467 Melrose Av | water damage repair including partial siding at rear, drywall repair along property line. maintain 1 hour fire rating. kitchen remodel in kind. one window at rear master bedroom - replacement in kind u factor less < 0.32Details
water damage repair including partial siding at rear, drywall repair along property line. maintain 1 hour fire rating. kitchen remodel in kind. one window at rear master bedroom - replacement in kind u factor less < 0.32 | $65,000 |
| Sep 5, 2018 | Completed final sign-off Apr 2019 | 889 Corbett Av | kitchen rmeodel including updating wiring. approx 8'x10'.Details
kitchen rmeodel including updating wiring. approx 8'x10'. | $1,500 |
| Oct 12, 2017 | Completed final sign-off Jul 2019 | 3528 Fulton St | to partially comply with nov #2017547495. to restore damage from 1/13/17 fire. new walls, floors, electircal, plumbing, hvac, kitchen & bathrs and some windows. no work at lower level unit under this permit.Details
to partially comply with nov #2017547495. to restore damage from 1/13/17 fire. new walls, floors, electircal, plumbing, hvac, kitchen & bathrs and some windows. no work at lower level unit under this permit. | $300,000 |
| Feb 1, 2016 | Completed final sign-off Jul 2016 | 533 Chenery St | kitchen remodel including skylight relocation, new headers in wall opening. no change to (e) egress or life safety.Details
kitchen remodel including skylight relocation, new headers in wall opening. no change to (e) egress or life safety. | $20,000 |
| Dec 29, 2015 | Completed final sign-off Dec 2016 | 3526 Fulton St | kitchen remodel, bath and bedroom remodel. add bathroom @ upper level, (n) windows at rear. interior remodeling and demo of existing rear landing/stairs. no other exterior work proposed. no work proposed to basement and roof.Details
kitchen remodel, bath and bedroom remodel. add bathroom @ upper level, (n) windows at rear. interior remodeling and demo of existing rear landing/stairs. no other exterior work proposed. no work proposed to basement and roof. | $30,000 |
| Oct 19, 2015 | Completed final sign-off Jun 2018 | 17 Uranus Tr | addition to the rear of mid and upper floors to replace existing deck remodel of kitchen, powder, master bedroom and bathDetails
addition to the rear of mid and upper floors to replace existing deck remodel of kitchen, powder, master bedroom and bath | $200,000 |
| May 15, 2014 | Completed final sign-off Sep 2014 | 3340 25th St | kitchen remodel at top floor. counter, new cabinet, same sink. lighting to comply with cec 150(k).Details
kitchen remodel at top floor. counter, new cabinet, same sink. lighting to comply with cec 150(k). | $40,000 |
| Dec 26, 2013 | Completed final sign-off Jan 2015 | 4331 17th St | addition of 38 sq.ft. to rear in s/w corner. space is over (e) ground floor. raise ceiling/roof (approx 18") of (e) rear bay window to match height of (e) roof. addition of 6' wide x 3' deep balcony on 2nd floor @ rear. kitchen remodel.Details
addition of 38 sq.ft. to rear in s/w corner. space is over (e) ground floor. raise ceiling/roof (approx 18") of (e) rear bay window to match height of (e) roof. addition of 6' wide x 3' deep balcony on 2nd floor @ rear. kitchen remodel. | $130,000 |
| Jun 28, 2013 | Completed final sign-off Dec 2013 | 333 Dellbrook Av | kitchen & bathroom remodel, remove wall between kitchen & living, replace with ceiling beam, kitchen lighting to be high efficacy, bath lighting to be high efficacy or occupancy sensorDetails
kitchen & bathroom remodel, remove wall between kitchen & living, replace with ceiling beam, kitchen lighting to be high efficacy, bath lighting to be high efficacy or occupancy sensor | $135,000 |
| Apr 9, 2013 | Completed final sign-off Sep 2014 | 507 Foerster St | remodel of 69 sq ft kitchen, new fixtures and finishes throughout. provide new kitchen island,cabinetry, appliance and opening to extg living room.Details
remodel of 69 sq ft kitchen, new fixtures and finishes throughout. provide new kitchen island,cabinetry, appliance and opening to extg living room. | $10,000 |
| Feb 11, 2013 | Completed final sign-off Jun 2013 | 2276 Great Hy | kitchen remodel , replace cabinets & countertops, upgrade electrical & plumbing no structural work. no alteration of partition wall.Details
kitchen remodel , replace cabinets & countertops, upgrade electrical & plumbing no structural work. no alteration of partition wall. | $20,000 |
| Oct 26, 2012 | Completed final sign-off Mar 2013 | 299 Douglass St | kitchen & half bathroom remodel, new plumbing & electrical upgrades. widen door way between kitchen & dining room (structural).Details
kitchen & half bathroom remodel, new plumbing & electrical upgrades. widen door way between kitchen & dining room (structural). | $30,000 |
| Feb 24, 2010 | Completed final sign-off Sep 2010 | 65 Manchester St | interior remodeling of upper two levels including kitchen, two bathrooms, new powder room. exterior work is limited tp replacement of front windows and addition of two windows in rear yard on third floor.Details
interior remodeling of upper two levels including kitchen, two bathrooms, new powder room. exterior work is limited tp replacement of front windows and addition of two windows in rear yard on third floor. | $110,000 |
| Jul 14, 2009 | Completed final sign-off Oct 2009 | 38 Clayton St | kitchen & bathroom remodel: install new cabinets, countertops, electrical & plumbing fixtures, upgrade elec & plumbing, no struct work o fany kind, replace 3 (e) windows @ kitchen lightwell. from 3' x3' to 2'w x 3'h in unit #38, reokace tukes @ wall & floor in bathroom, elec & plbg separate permitDetails
kitchen & bathroom remodel: install new cabinets, countertops, electrical & plumbing fixtures, upgrade elec & plumbing, no struct work o fany kind, replace 3 (e) windows @ kitchen lightwell. from 3' x3' to 2'w x 3'h in unit #38, reokace tukes @ wall & floor in bathroom, elec & plbg separate permit | $30,000 |
| Dec 11, 2008 | Completed final sign-off Jun 2021 | 891 Corbett Av | kitchen remodel - replace existing cabeints & countertop upgrade electrical & plumbing. no alteration of (e) wall. work on #891.Details
kitchen remodel - replace existing cabeints & countertop upgrade electrical & plumbing. no alteration of (e) wall. work on #891. | $18,670 |
| Jun 20, 2008 | Completed final sign-off Sep 2008 | 501 Buena Vista West Av | work @ unit# 501 only.kitchen remodel replace (e) cabinets, countertops, electrical, plumbing, drywall, insulation. non-structural. in kind. same size & location. change of unit# from # 503 to # 501. ref pa# 2008/06/09/3976 scope of work is for unit# 501 only. previsous permit has wrong unit number.Details
work @ unit# 501 only.kitchen remodel replace (e) cabinets, countertops, electrical, plumbing, drywall, insulation. non-structural. in kind. same size & location. change of unit# from # 503 to # 501. ref pa# 2008/06/09/3976 scope of work is for unit# 501 only. previsous permit has wrong unit number. | $45,000 |
| Jun 9, 2008 | Expired or cancelled withdrawn Jun 2008 | 501 Buena Vista West Av | work @ unit# 503 only. kitchen remodel. replace (e) cabinets, countertops, electrical, plumbing, drywall, insulation. non-structural. in kind.Details
work @ unit# 503 only. kitchen remodel. replace (e) cabinets, countertops, electrical, plumbing, drywall, insulation. non-structural. in kind. | $45,000 |
| Sep 27, 2006 | Completed final sign-off Feb 2007 | 501 Buena Vista West Av | unit# 501. kitchen remodel, cabinets, counters, sink & fixtures, appliances, new sheetrock, ceiling & walls. lighting will comply with title 24 requirements.Details
unit# 501. kitchen remodel, cabinets, counters, sink & fixtures, appliances, new sheetrock, ceiling & walls. lighting will comply with title 24 requirements. | $20,000 |
| Apr 11, 2006 | Completed final sign-off Aug 2006 | 269 Joost Av | kitchen & 1 bathroom remodel (upstairs only). is windows replacement (front & rear).Details
kitchen & 1 bathroom remodel (upstairs only). is windows replacement (front & rear). | $60,000 |