Back to bathroom remodel contractors
G-Max Construction
- Based in
- San Francisco
- On San Francisco permits
- Nov 2004 to Jul 2021
- Last 24 months
- 0 permits filed
59 permits since 2000: 54 completed, 1 never finaled, 4 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
16 bathroom remodel permits: 16 completed. Typically 0 days from filing to permit and 157 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 2, 2021 | Completed final sign-off Dec 2021 | 1362 07th Av | 4/f: bathroomremodel: including removal of (e) tub/shower 7 creating new shower stll at tub location. demolition of adjacent bathroom & conversion to walk-in closet per plans.Details
4/f: bathroomremodel: including removal of (e) tub/shower 7 creating new shower stll at tub location. demolition of adjacent bathroom & conversion to walk-in closet per plans. | $20,000 |
| Sep 11, 2020 | Completed final sign-off Dec 2020 | 73 Collingwood St | rear bldg bathroom remodel - replace plumbing fixtures in existing location. no new locations; new tile work; no electrical workDetails
rear bldg bathroom remodel - replace plumbing fixtures in existing location. no new locations; new tile work; no electrical work | $15,000 |
| Jan 9, 2019 | Completed final sign-off May 2019 | 65 Uranus Tr | bathroom remodel: replace ktichen patio doors at rear. replace patio tile.Details
bathroom remodel: replace ktichen patio doors at rear. replace patio tile. | $25,000 |
| Feb 12, 2016 | Completed final sign-off Jul 2016 | 533 Chenery St | full bathroom remodelDetails
full bathroom remodel | $10,000 |
| Dec 29, 2015 | Completed final sign-off Dec 2016 | 3526 Fulton St | kitchen remodel, bath and bedroom remodel. add bathroom @ upper level, (n) windows at rear. interior remodeling and demo of existing rear landing/stairs. no other exterior work proposed. no work proposed to basement and roof.Details
kitchen remodel, bath and bedroom remodel. add bathroom @ upper level, (n) windows at rear. interior remodeling and demo of existing rear landing/stairs. no other exterior work proposed. no work proposed to basement and roof. | $30,000 |
| Oct 19, 2015 | Completed final sign-off Jun 2018 | 17 Uranus Tr | addition to the rear of mid and upper floors to replace existing deck remodel of kitchen, powder, master bedroom and bathDetails
addition to the rear of mid and upper floors to replace existing deck remodel of kitchen, powder, master bedroom and bath | $200,000 |
| Jun 28, 2013 | Completed final sign-off Dec 2013 | 333 Dellbrook Av | kitchen & bathroom remodel, remove wall between kitchen & living, replace with ceiling beam, kitchen lighting to be high efficacy, bath lighting to be high efficacy or occupancy sensorDetails
kitchen & bathroom remodel, remove wall between kitchen & living, replace with ceiling beam, kitchen lighting to be high efficacy, bath lighting to be high efficacy or occupancy sensor | $135,000 |
| Oct 26, 2012 | Completed final sign-off Mar 2013 | 299 Douglass St | kitchen & half bathroom remodel, new plumbing & electrical upgrades. widen door way between kitchen & dining room (structural).Details
kitchen & half bathroom remodel, new plumbing & electrical upgrades. widen door way between kitchen & dining room (structural). | $30,000 |
| Jan 19, 2012 | Completed final sign-off Jan 2013 | 889 Corbett Av | one bathroom remodel, no structural, plumbing fixture and electrical upgrades, tilingDetails
one bathroom remodel, no structural, plumbing fixture and electrical upgrades, tiling | $5,000 |
| Feb 24, 2010 | Completed final sign-off Sep 2010 | 65 Manchester St | interior remodeling of upper two levels including kitchen, two bathrooms, new powder room. exterior work is limited tp replacement of front windows and addition of two windows in rear yard on third floor.Details
interior remodeling of upper two levels including kitchen, two bathrooms, new powder room. exterior work is limited tp replacement of front windows and addition of two windows in rear yard on third floor. | $110,000 |
| Jan 26, 2010 | Completed final sign-off Apr 2010 | 301 San Benito Wy | bathroom remodel: replac (e) drywall, plumbing & electrical upgrade, tile. no structural work, install r-13 & r-30 insulation in bathroom, no moving or adding wallsDetails
bathroom remodel: replac (e) drywall, plumbing & electrical upgrade, tile. no structural work, install r-13 & r-30 insulation in bathroom, no moving or adding walls | $20,000 |
| Jan 6, 2010 | Completed final sign-off Jun 2010 | 77 Carmelita St | bathroom remodel: replace (e) toilet; vanity sink; remove (e) tub & replace with shower enclousure; replace one (e) window (46x24) in (e) opening in bathroom; upgrade electrical & plumbing. all work at rear 2nd. flr.Details
bathroom remodel: replace (e) toilet; vanity sink; remove (e) tub & replace with shower enclousure; replace one (e) window (46x24) in (e) opening in bathroom; upgrade electrical & plumbing. all work at rear 2nd. flr. | $20,000 |
| Jul 14, 2009 | Completed final sign-off Oct 2009 | 38 Clayton St | kitchen & bathroom remodel: install new cabinets, countertops, electrical & plumbing fixtures, upgrade elec & plumbing, no struct work o fany kind, replace 3 (e) windows @ kitchen lightwell. from 3' x3' to 2'w x 3'h in unit #38, reokace tukes @ wall & floor in bathroom, elec & plbg separate permitDetails
kitchen & bathroom remodel: install new cabinets, countertops, electrical & plumbing fixtures, upgrade elec & plumbing, no struct work o fany kind, replace 3 (e) windows @ kitchen lightwell. from 3' x3' to 2'w x 3'h in unit #38, reokace tukes @ wall & floor in bathroom, elec & plbg separate permit | $30,000 |
| Jul 2, 2008 | Completed final sign-off Feb 2009 | 65 Manchester St | additon of interior stair to connect two floors of lower unit, replacement of 3 windows at rear, remodel bathroom and master bedroom. no additional floor area. no exterior work except windows. new study under stair.Details
additon of interior stair to connect two floors of lower unit, replacement of 3 windows at rear, remodel bathroom and master bedroom. no additional floor area. no exterior work except windows. new study under stair. | $65,000 |
| Apr 11, 2006 | Completed final sign-off Aug 2006 | 269 Joost Av | kitchen & 1 bathroom remodel (upstairs only). is windows replacement (front & rear).Details
kitchen & 1 bathroom remodel (upstairs only). is windows replacement (front & rear). | $60,000 |
| Nov 19, 2004 | Completed final sign-off Apr 2005 | 884 Dolores St | demolition of (e) bathroom, removal of all fixture new plumbing for toilet, tub. addition of shower.Details
demolition of (e) bathroom, removal of all fixture new plumbing for toilet, tub. addition of shower. | $17,000 |