G Construction Service Inc
- Based in
- South San Francisco
- On San Francisco permits
- Jan 2022 to Jun 2026
- Last 24 months
- 10 permits filed
48 permits since 2000: 43 completed, 3 in progress, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
5 stairs permits: 3 completed, 2 in progress. Typically 36 days from filing to permit and 196 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 16, 2026 | In progress filed Jun 2026, not yet issued | 59 Cook St | replace windows at the front, one picture window at center, two csement windows at the sides. replace staircase at the front. install slate stair trede and riser. repair dry rot underneath as needed.Details
replace windows at the front, one picture window at center, two csement windows at the sides. replace staircase at the front. install slate stair trede and riser. repair dry rot underneath as needed. | $15,000 |
| Jun 30, 2025 | In progress issued Dec 2025 | 931 Edinburgh St | rear horizontal addition and interior remodel. 1/f: add (2) bedrooms, (2) full bath, family room, media room and wet bar. relocate laundry. 2/f: remodel bedroom, living room, and bathroom. relocate dining and kitchen. add (1) full bath and interior stairs. replace windows and siding at rear.Details
rear horizontal addition and interior remodel. 1/f: add (2) bedrooms, (2) full bath, family room, media room and wet bar. relocate laundry. 2/f: remodel bedroom, living room, and bathroom. relocate dining and kitchen. add (1) full bath and interior stairs. replace windows and siding at rear. | $250,000 |
| Aug 8, 2024 | Completed final sign-off May 2025 | 775 41st Av | 1st fl: add stairs to connect (e) living space 2nd fl: remodel half bath & kitchen 3rd fl remodel (e) bathroom & add 1 full bathDetails
1st fl: add stairs to connect (e) living space 2nd fl: remodel half bath & kitchen 3rd fl remodel (e) bathroom & add 1 full bath | $70,000 |
| Jul 27, 2023 | Completed final sign-off Dec 2023 | 940 Cayuga Av | reconfigure and rebuild front entry stairs and landing per plans, replace / repair front siding / waterproofing.Details
reconfigure and rebuild front entry stairs and landing per plans, replace / repair front siding / waterproofing. | $5,000 |
| Mar 31, 2023 | Completed final sign-off Oct 2023 | 360 Allison St | 1/f: convert (e) game rm to kitchenette. 2/f: re-built rear deck & stairway. replace windows @ rearDetails
1/f: convert (e) game rm to kitchenette. 2/f: re-built rear deck & stairway. replace windows @ rear | $23,000 |