Back to kitchen remodel contractors
G Construction Service Inc
- Based in
- South San Francisco
- On San Francisco permits
- Jan 2022 to Jun 2026
- Last 24 months
- 10 permits filed
48 permits since 2000: 43 completed, 3 in progress, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
18 kitchen remodel permits: 16 completed, 1 in progress, 1 expired or cancelled. Typically 0 days from filing to permit and 140 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 6, 2026 | Completed final sign-off Sep 2026 | 214 Lathrop Av | kitchen renovation in kind, bathroom renovation in kind, tub to shower, all new fixtures. replace electrical panel. no layout change, no wall stud framing demolitionDetails
kitchen renovation in kind, bathroom renovation in kind, tub to shower, all new fixtures. replace electrical panel. no layout change, no wall stud framing demolition | $35,000 |
| Oct 8, 2025 | Completed final sign-off Jan 2026 | 36 Caselli Av | 2/f -remodel & reconfigure bathroom & kitchen wall per planDetails
2/f -remodel & reconfigure bathroom & kitchen wall per plan | $29,600 |
| Jun 30, 2025 | In progress issued Dec 2025 | 931 Edinburgh St | rear horizontal addition and interior remodel. 1/f: add (2) bedrooms, (2) full bath, family room, media room and wet bar. relocate laundry. 2/f: remodel bedroom, living room, and bathroom. relocate dining and kitchen. add (1) full bath and interior stairs. replace windows and siding at rear.Details
rear horizontal addition and interior remodel. 1/f: add (2) bedrooms, (2) full bath, family room, media room and wet bar. relocate laundry. 2/f: remodel bedroom, living room, and bathroom. relocate dining and kitchen. add (1) full bath and interior stairs. replace windows and siding at rear. | $250,000 |
| Feb 19, 2025 | Completed final sign-off Jul 2025 | 1545 Lake St | in-kind remodeling of 1 kitchen(s) in 2nd flDetails
in-kind remodeling of 1 kitchen(s) in 2nd fl | $12,000 |
| Nov 21, 2024 | Completed final sign-off Apr 2025 | 3058 Turk Bl | bathroom and kitchen remodel in kind. all new fixtures., replace 2 windows at rear of building, replace plaster with new drywall about 500sqftDetails
bathroom and kitchen remodel in kind. all new fixtures., replace 2 windows at rear of building, replace plaster with new drywall about 500sqft | $25,000 |
| Aug 8, 2024 | Completed final sign-off May 2025 | 775 41st Av | 1st fl: add stairs to connect (e) living space 2nd fl: remodel half bath & kitchen 3rd fl remodel (e) bathroom & add 1 full bathDetails
1st fl: add stairs to connect (e) living space 2nd fl: remodel half bath & kitchen 3rd fl remodel (e) bathroom & add 1 full bath | $70,000 |
| Aug 2, 2024 | Completed final sign-off Dec 2024 | 72 Fair Oaks St | kitchen remodel in kind, no change of layout x2. bathroom remodel in kind no change of layout x2. one tub, one shower pan. add subpanel x2 - one in each unit. new wire in two units.Details
kitchen remodel in kind, no change of layout x2. bathroom remodel in kind no change of layout x2. one tub, one shower pan. add subpanel x2 - one in each unit. new wire in two units. | $60,000 |
| Jul 8, 2024 | Completed final sign-off Aug 2024 | 4116 Ortega St | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $22,000 |
| Mar 10, 2024 | Completed final sign-off May 2024 | 2773 Bush St | in-kind remodeling of 1 kitchen(s) in 2nd flDetails
in-kind remodeling of 1 kitchen(s) in 2nd fl | $15,000 |
| Jan 22, 2024 | Expired or cancelled expired Feb 2026 | 415 Colon Av | demo existing kitchen, install new kitchen, replace windows inkind (rear) , remove french doors, remodel full bath, remodel half bath, remove a section of bearing wall b/w kitchen and dining room, install new ceiling beams. new windows are aluminum clad wood.Details
demo existing kitchen, install new kitchen, replace windows inkind (rear) , remove french doors, remodel full bath, remodel half bath, remove a section of bearing wall b/w kitchen and dining room, install new ceiling beams. new windows are aluminum clad wood. | $45,000 |
| Nov 20, 2023 | Completed final sign-off Apr 2024 | 1229 21st Av | remodel kitchen and bathroom, convert power room to full bathroom per plansDetails
remodel kitchen and bathroom, convert power room to full bathroom per plans | $48,000 |
| Oct 23, 2023 | Completed final sign-off Feb 2024 | 2171 Sacramento St | remodel bathroom in kind all new fixtures, add wash/ dryer combo : add 6 recessed lights in livingroom and hallway: replace kitchen countertop: relocate electrical panel outside from closet: shower panDetails
remodel bathroom in kind all new fixtures, add wash/ dryer combo : add 6 recessed lights in livingroom and hallway: replace kitchen countertop: relocate electrical panel outside from closet: shower pan | $25,000 |
| Sep 21, 2023 | Completed final sign-off Apr 2024 | 40 Prague St | comply with complaint 202313210, 202313211 and 202313212 remodel kitchen, convert (e) bath to one full bath & powder room at 2nd fl.Details
comply with complaint 202313210, 202313211 and 202313212 remodel kitchen, convert (e) bath to one full bath & powder room at 2nd fl. | $43,000 |
| May 25, 2023 | Completed final sign-off Oct 2023 | 29 Castle Manor Av | remodel (1) kitchen in kind. no change of layout. add 4 recessed lights in kitchen. add 8 recessed lights in playrooms. replace vinyl floor in (1) kitchen and (1) bathroom about 150 sf. (all work on ground floor area)Details
remodel (1) kitchen in kind. no change of layout. add 4 recessed lights in kitchen. add 8 recessed lights in playrooms. replace vinyl floor in (1) kitchen and (1) bathroom about 150 sf. (all work on ground floor area) | $23,000 |
| Mar 31, 2023 | Completed final sign-off Oct 2023 | 360 Allison St | 1/f: convert (e) game rm to kitchenette. 2/f: re-built rear deck & stairway. replace windows @ rearDetails
1/f: convert (e) game rm to kitchenette. 2/f: re-built rear deck & stairway. replace windows @ rear | $23,000 |
| Sep 8, 2022 | Completed final sign-off Oct 2022 | 1700 Gough St | unit #21: remove and replace kitchen cabinet with no change of layout. replace vanity cabinet, countertop, and faucet. replace toilet. replace ventilation fan in bathroom. replace carpet floor with vinyl planic floor in living room and kitchen.Details
unit #21: remove and replace kitchen cabinet with no change of layout. replace vanity cabinet, countertop, and faucet. replace toilet. replace ventilation fan in bathroom. replace carpet floor with vinyl planic floor in living room and kitchen. | $15,000 |
| Jun 22, 2022 | Completed final sign-off Apr 2023 | 43 Carr St | 2/f: relocated kitchen, bath, remodel bedrooms, add 1 bath & 1 bedroom. resize and replace windows at side of houseDetails
2/f: relocated kitchen, bath, remodel bedrooms, add 1 bath & 1 bedroom. resize and replace windows at side of house | $47,600 |
| Mar 1, 2022 | Completed final sign-off Jun 2022 | 431 Holloway Av | main floor: remodel kitchen and bathroom. relocate washer and dryer at main fl.Details
main floor: remodel kitchen and bathroom. relocate washer and dryer at main fl. | $28,300 |