Future General Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jul 2016 to Sep 2026
- Last 24 months
- 5 permits filed
56 permits since 2000: 48 completed, 2 in progress, 6 never finaled.
Of the 6 never-finaled permits, 2 are 3 to 5 years old, 4 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
8 stairs permits: 8 completed. Typically 28 days from filing to permit and 158 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 20, 2026 | Completed final sign-off Sep 2026 | 824 Vallejo St | new interior partitions and door to enclose existing stair, only interior work, no structuralDetails
new interior partitions and door to enclose existing stair, only interior work, no structural | $5,000 |
| Aug 11, 2021 | Completed final sign-off Jul 2022 | 411 Panorama Dr | addition of deck and stair on rear of building and remove of extg window and replace with new door.Details
addition of deck and stair on rear of building and remove of extg window and replace with new door. | $30,000 |
| Aug 2, 2021 | Completed final sign-off Feb 2022 | 737 Guerrero St | remodel kitchen, bath, laundry room on 2nd fl. remodel laundry room 1st. dryrot joist, studs, floor sheathing replacement in laundry room on 1st and 2nd fl per plans. repair e siding stair and landing, not to exceed 50% at rearDetails
remodel kitchen, bath, laundry room on 2nd fl. remodel laundry room 1st. dryrot joist, studs, floor sheathing replacement in laundry room on 1st and 2nd fl per plans. repair e siding stair and landing, not to exceed 50% at rear | $45,000 |
| Oct 22, 2020 | Completed final sign-off Feb 2021 | 4046 Fulton St | hand rail improvement. provide exterior handrail for elderly tenant access & safety to incl removing 2 (e) handrails at entry porch stairway & replace in-kind & add (n) handrail at center of entry porch & add 2 (n) handrails at sidewalk stairwayDetails
hand rail improvement. provide exterior handrail for elderly tenant access & safety to incl removing 2 (e) handrails at entry porch stairway & replace in-kind & add (n) handrail at center of entry porch & add 2 (n) handrails at sidewalk stairway | $2,500 |
| May 7, 2020 | Completed final sign-off Nov 2020 | 2260 Mission St | voluntary structural strenthening of exterior stair case & parapet wallDetails
voluntary structural strenthening of exterior stair case & parapet wall | $8,500 |
| Feb 11, 2020 | Completed final sign-off Aug 2020 | 63 Melrose Av | revision to 201909303117: cancel e door that leads to garage fro lr, install n pocket door at lr, close e door from lr to stairway, install reg door instead of 1 hr sep wall at storage room. install new utility sink, replace ceiling lights, cover 220 v outlet, build new backyard handrailDetails
revision to 201909303117: cancel e door that leads to garage fro lr, install n pocket door at lr, close e door from lr to stairway, install reg door instead of 1 hr sep wall at storage room. install new utility sink, replace ceiling lights, cover 220 v outlet, build new backyard handrail | $3,500 |
| May 23, 2019 | Completed final sign-off Jun 2019 | 4839 Mission St | removing deck and stair in the backyard. in filling a back door with wall.Details
removing deck and stair in the backyard. in filling a back door with wall. | $3,000 |
| Apr 23, 2019 | Completed final sign-off Jan 2020 | 122 Maynard St | kitchen remodel remove 2nd stair and convert to closet. new bridge connection 2nd flr bedrooms to rear yardDetails
kitchen remodel remove 2nd stair and convert to closet. new bridge connection 2nd flr bedrooms to rear yard | $100,000 |