Back to kitchen remodel contractors
Future General Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jul 2016 to Sep 2026
- Last 24 months
- 5 permits filed
56 permits since 2000: 48 completed, 2 in progress, 6 never finaled.
Of the 6 never-finaled permits, 2 are 3 to 5 years old, 4 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
14 kitchen remodel permits: 12 completed, 2 never finaled. Typically 14 days from filing to permit and 154 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 14, 2022 | Never finaled issued Jun 2023, no final | 737 Guerrero St | add a state-mandated adu per ca government code section 65852.2. new two bedroom,two bathrooms,kitchen and living room accessory dwelling unit on 1st fl. mandatory seismic strenfgthening per sfbc approved under buidlng appl# 2022-0601-5362.Details
add a state-mandated adu per ca government code section 65852.2. new two bedroom,two bathrooms,kitchen and living room accessory dwelling unit on 1st fl. mandatory seismic strenfgthening per sfbc approved under buidlng appl# 2022-0601-5362. | $80,000 |
| Apr 29, 2022 | Completed final sign-off Dec 2022 | 5392 Mission St | to comply with complaint# 202286559. legalization of unauthorized (n) commercial kitchen hood & cooler. create new vent opening on ottowa ave wall, painted. adding ada automatic door opener.Details
to comply with complaint# 202286559. legalization of unauthorized (n) commercial kitchen hood & cooler. create new vent opening on ottowa ave wall, painted. adding ada automatic door opener. | $15,000 |
| Apr 26, 2022 | Completed final sign-off Jan 2023 | 2667 21st St | renovation of 2/f & 3/f kitchens. remodel 3/f bathroom. 3/f ktichen to add and remoe non-structural partiions, doors, fixtures and finishes.Details
renovation of 2/f & 3/f kitchens. remodel 3/f bathroom. 3/f ktichen to add and remoe non-structural partiions, doors, fixtures and finishes. | $40,000 |
| Mar 15, 2022 | Completed final sign-off Jul 2022 | 566 Natoma St | 4 kitchen and 4 bathroom full remodeling at units 566, 566a, 566b, and 566c natoma st. upgrade electrical as per code req at each unit, soft story retrofit separate permits, window replacements under separate permits, all remodeling in kind, no changes or moving walls.Details
4 kitchen and 4 bathroom full remodeling at units 566, 566a, 566b, and 566c natoma st. upgrade electrical as per code req at each unit, soft story retrofit separate permits, window replacements under separate permits, all remodeling in kind, no changes or moving walls. | $90,000 |
| Jan 27, 2022 | Completed final sign-off Jun 2022 | 739 Guerrero St | unit 739: remodel (e) kitchen & (e) bathroom on 1st fl (739 guerrero st). remove sheetrock to update electrical.Details
unit 739: remodel (e) kitchen & (e) bathroom on 1st fl (739 guerrero st). remove sheetrock to update electrical. | $20,000 |
| Aug 2, 2021 | Completed final sign-off Feb 2022 | 737 Guerrero St | remodel kitchen, bath, laundry room on 2nd fl. remodel laundry room 1st. dryrot joist, studs, floor sheathing replacement in laundry room on 1st and 2nd fl per plans. repair e siding stair and landing, not to exceed 50% at rearDetails
remodel kitchen, bath, laundry room on 2nd fl. remodel laundry room 1st. dryrot joist, studs, floor sheathing replacement in laundry room on 1st and 2nd fl per plans. repair e siding stair and landing, not to exceed 50% at rear | $45,000 |
| Jun 16, 2020 | Completed final sign-off Nov 2020 | 2260 Mission St | all 6 kitchens + 6 bathrooms remodel in-kind. replace 6 water heaters in-kind. replace 6 room heaters in kind. upgrading electrical and plumbing. replacing kitchens cabinets with granite countertops and new surface mount ceiling light. bathrooms replacing new bathtub/shower pan. all work in kind.Details
all 6 kitchens + 6 bathrooms remodel in-kind. replace 6 water heaters in-kind. replace 6 room heaters in kind. upgrading electrical and plumbing. replacing kitchens cabinets with granite countertops and new surface mount ceiling light. bathrooms replacing new bathtub/shower pan. all work in kind. | $250,000 |
| May 6, 2020 | Completed final sign-off Jan 2021 | 369 03rd Av | replace a total of 29 electric wall heaters throughout the bldg aprtmnts. 7 bathrm remodeling (units 1,3,5,6,7,8,11). 5 kitchen remodeling(units 3,5,6,8,11). replace 28 aluminum street facing windows with standard aluminum, 1280h, hva, standard z-bar, extr. bronze anodized/interior bronzed in kindDetails
replace a total of 29 electric wall heaters throughout the bldg aprtmnts. 7 bathrm remodeling (units 1,3,5,6,7,8,11). 5 kitchen remodeling(units 3,5,6,8,11). replace 28 aluminum street facing windows with standard aluminum, 1280h, hva, standard z-bar, extr. bronze anodized/interior bronzed in kind | $150,000 |
| May 1, 2020 | Completed final sign-off Jun 2020 | 3225 24th St | unit 2 & unit 4: kitchen remodelsDetails
unit 2 & unit 4: kitchen remodels | $15,000 |
| Nov 7, 2019 | Completed final sign-off Dec 2019 | 1684 Grove St | comply with nov 201975291 kitchen: r/r in kind kitchen cabinets + counter tops with 4in backsplash. no structural work.Details
comply with nov 201975291 kitchen: r/r in kind kitchen cabinets + counter tops with 4in backsplash. no structural work. | $4,500 |
| Sep 30, 2019 | Completed final sign-off Aug 2020 | 63 Melrose Av | legalize rooms down in unauthorized dwelling unit by removing kitchen, lower floors in bedroom and living rea to min 7'6 hgt, add new door at e windows location in bedroom, work to comply with nov 201968631Details
legalize rooms down in unauthorized dwelling unit by removing kitchen, lower floors in bedroom and living rea to min 7'6 hgt, add new door at e windows location in bedroom, work to comply with nov 201968631 | $40,000 |
| Sep 5, 2019 | Never finaled filed Sep 2019, never issued | 1684 Grove St | kitchen: r/r in-kind kitchen cabinets and countertops with 4in backsplash to comply with nov201975291.Details
kitchen: r/r in-kind kitchen cabinets and countertops with 4in backsplash to comply with nov201975291. | $4,500 |
| Apr 23, 2019 | Completed final sign-off Jan 2020 | 122 Maynard St | kitchen remodel remove 2nd stair and convert to closet. new bridge connection 2nd flr bedrooms to rear yardDetails
kitchen remodel remove 2nd stair and convert to closet. new bridge connection 2nd flr bedrooms to rear yard | $100,000 |
| Jun 1, 2018 | Completed final sign-off Sep 2018 | 60 28th St | 6 kitchen & 6 remodel, paint all apartments, 11 window replacement not visible from st. to comply with #201792361 item 1, 2, 4, 5, 6, 7, 8, 9. #201780731 items 2, 3, 4. #201637281 item 2, 3. #201654801 item 2, 3. #201773521, 201768031, 201636091.Details
6 kitchen & 6 remodel, paint all apartments, 11 window replacement not visible from st. to comply with #201792361 item 1, 2, 4, 5, 6, 7, 8, 9. #201780731 items 2, 3, 4. #201637281 item 2, 3. #201654801 item 2, 3. #201773521, 201768031, 201636091. | $250,000 |