Back to kitchen remodel contractors
Frank Walley Construction
- Based in
- Pacifica
- On San Francisco permits
- Apr 2001 to Jun 2026
- Last 24 months
- 1 permit filed
30 permits since 2000: 25 completed, 1 in progress, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 6 completed, 1 in progress. Typically 0 days from filing to permit and 126 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 2, 2026 | In progress issued Jul 2026 | 2772 41st Av | new porch and stair to yard, kitchen remodel, remodel existing bathroom main level and add bathroom at main level.replace 7 windows.Details
new porch and stair to yard, kitchen remodel, remodel existing bathroom main level and add bathroom at main level.replace 7 windows. | $50,000 |
| Jul 14, 2014 | Completed final sign-off Jun 2015 | 142 Ord St | top unit - remodel bathroom, fixture location will change, add urinal, replace (e) skylight; add exhaust fan, repair dryrot in back of kitchen area. to comply with cec150(k) 10Details
top unit - remodel bathroom, fixture location will change, add urinal, replace (e) skylight; add exhaust fan, repair dryrot in back of kitchen area. to comply with cec150(k) 10 | $50,000 |
| Nov 27, 2012 | Completed final sign-off Apr 2013 | 2670 44th Av | remodel existing kitchen & bathroom. replace approx 260 sf of siding on front of home@ upper level.Details
remodel existing kitchen & bathroom. replace approx 260 sf of siding on front of home@ upper level. | $30,000 |
| May 16, 2012 | Completed final sign-off Oct 2012 | 2029 Pierce St | replace tub, tile valve, vanity, and floor tile in extg master bath. replace vanity in 1/2 bath. repalce counter top in kitchen. no change on walls and openings.Details
replace tub, tile valve, vanity, and floor tile in extg master bath. replace vanity in 1/2 bath. repalce counter top in kitchen. no change on walls and openings. | $18,000 |
| Dec 5, 2011 | Completed final sign-off Apr 2012 | 1732 North Point St | remodel (1) kitchen. no structural changes. insulation sheeetrock layout to remain the same.Details
remodel (1) kitchen. no structural changes. insulation sheeetrock layout to remain the same. | $25,000 |
| Sep 10, 2010 | Completed final sign-off Nov 2010 | 2701 Van Ness Av | replace (e) cabinets and appliances. bring electrical for kitchen up to code. min. 50% of kitchenlighting wattage to be high efficacy lights.Details
replace (e) cabinets and appliances. bring electrical for kitchen up to code. min. 50% of kitchenlighting wattage to be high efficacy lights. | $15,000 |
| Jul 30, 2010 | Completed final sign-off Oct 2010 | 435 Lansdale Av | remodel (e) kitchen, replace with new cabinets, appliances, counter. fixtures/appliances in same location. replace 2 (e) windows & (e) patio door (in rear). replace (e) cabinets in breakfast areaDetails
remodel (e) kitchen, replace with new cabinets, appliances, counter. fixtures/appliances in same location. replace 2 (e) windows & (e) patio door (in rear). replace (e) cabinets in breakfast area | $45,000 |