Permit GraphShortlistSan Francisco building permits since 2000

Frank Walley Construction

Contractor license
478759
State license record
Based in
Pacifica
On San Francisco permits
Apr 2001 to Jun 2026
Last 24 months
1 permit filed

30 permits since 2000: 25 completed, 1 in progress, 3 never finaled, 1 expired or cancelled.

Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Bathroom remodel permits

AllDeck 4Stairs 3Kitchen remodel 7Bathroom remodel 7

7 bathroom remodel permits: 6 completed, 1 in progress. Typically 0 days from filing to permit and 104 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Jun 2, 2026In progress
issued Jul 2026
2772 41st Avnew porch and stair to yard, kitchen remodel, remodel existing bathroom main level and add bathroom at main level.replace 7 windows.
Details
Permit
202606022354
Status
issued
Filed
Jun 2, 2026
Permit issued
Jul 8, 2026
Declared cost
$50,000
Address
2772 41st Av

new porch and stair to yard, kitchen remodel, remodel existing bathroom main level and add bathroom at main level.replace 7 windows.

Open the permit page

$50,000
Jul 14, 2014Completed
final sign-off Jun 2015
142 Ord Sttop unit - remodel bathroom, fixture location will change, add urinal, replace (e) skylight; add exhaust fan, repair dryrot in back of kitchen area. to comply with cec150(k) 10
Details
Permit
201407141236
Status
complete
Filed
Jul 14, 2014
Permit issued
Jul 14, 2014
Final sign-off
Jun 17, 2015
Declared cost
$50,000
Address
142 Ord St

top unit - remodel bathroom, fixture location will change, add urinal, replace (e) skylight; add exhaust fan, repair dryrot in back of kitchen area. to comply with cec150(k) 10

Open the permit page

$50,000
Nov 27, 2012Completed
final sign-off Apr 2013
2670 44th Avremodel existing kitchen & bathroom. replace approx 260 sf of siding on front of home@ upper level.
Details
Permit
201211274939
Status
complete
Filed
Nov 27, 2012
Permit issued
Nov 27, 2012
Final sign-off
Apr 2, 2013
Declared cost
$30,000
Address
2670 44th Av

remodel existing kitchen & bathroom. replace approx 260 sf of siding on front of home@ upper level.

Open the permit page

$30,000
Jul 20, 2012Completed
final sign-off Sep 2012
4321 17th Stupstairs bathroom: remove shower and put new washer/dryer with rqrd. ducting in its place. new vanity, new tile floor. lower bathroom: extend (e) bathroom into adjoining closet space. install bigger vanity in same location. close (e) bathroom door. replace (e) 6' closet door
Details
Permit
201207205420
Status
complete
Filed
Jul 20, 2012
Permit issued
Jul 20, 2012
Final sign-off
Sep 17, 2012
Declared cost
$18,000
Address
4321 17th St

upstairs bathroom: remove shower and put new washer/dryer with rqrd. ducting in its place. new vanity, new tile floor. lower bathroom: extend (e) bathroom into adjoining closet space. install bigger vanity in same location. close (e) bathroom door. replace (e) 6' closet door

Open the permit page

$18,000
May 16, 2012Completed
final sign-off Oct 2012
2029 Pierce Streplace tub, tile valve, vanity, and floor tile in extg master bath. replace vanity in 1/2 bath. repalce counter top in kitchen. no change on walls and openings.
Details
Permit
201205160622
Status
complete
Filed
May 16, 2012
Permit issued
May 16, 2012
Final sign-off
Oct 30, 2012
Declared cost
$18,000
Address
2029 Pierce St

replace tub, tile valve, vanity, and floor tile in extg master bath. replace vanity in 1/2 bath. repalce counter top in kitchen. no change on walls and openings.

Open the permit page

$18,000
Oct 6, 2009Completed
final sign-off Dec 2009
838 43rd Avupgrade 2 half baths with new tub, tile, wall, and floor. plumbing fixtures, lights, drywall, insulation, new lighting. no adding or moving walls
Details
Permit
200910068419
Status
complete
Filed
Oct 6, 2009
Permit issued
Oct 6, 2009
Final sign-off
Dec 1, 2009
Declared cost
$15,000
Address
838 43rd Av

upgrade 2 half baths with new tub, tile, wall, and floor. plumbing fixtures, lights, drywall, insulation, new lighting. no adding or moving walls

Open the permit page

$15,000
Apr 3, 2002Completed
final sign-off Jul 2002
102 Pope Stchange rear stairs exiting to appease neighbors concerning add bathroom at lower level-
Details
Permit
200204033032
Status
complete
Filed
Apr 3, 2002
Permit issued
Apr 23, 2002
Final sign-off
Jul 15, 2002
Address
102 Pope St

change rear stairs exiting to appease neighbors concerning add bathroom at lower level-

Open the permit page