Fortitude Construction Inc.
- Based in
- Campbell
- On San Francisco permits
- Feb 2014 to Dec 2018
- Last 24 months
- 0 permits filed
22 permits since 2000: 16 completed, 3 never finaled, 3 expired or cancelled.
Of the 3 never-finaled permits, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 2 completed, 2 expired or cancelled. Typically 0 days from filing to permit and 416 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 17, 2017 | Completed final sign-off Feb 2018 | 3714 23rd St | revision to pa#201701268008, remodel 4 bathrooms, 1 kitchen on upper unit.Details
revision to pa#201701268008, remodel 4 bathrooms, 1 kitchen on upper unit. | $20,000 |
| Feb 17, 2016 | Expired or cancelled expired Dec 2023 | 2083 San Jose Av | to comply with nov#201491816: fire damage repair. replace exterior siding affected. window on 2/f not street facing, 2/f kitchen; and master bedroom flooring.Details
to comply with nov#201491816: fire damage repair. replace exterior siding affected. window on 2/f not street facing, 2/f kitchen; and master bedroom flooring. | $35,000 |
| Feb 12, 2016 | Expired or cancelled expired Apr 2018 | 510 Orizaba Av | replace kitchen cabinet, drywall, counter tops. remodel master bathroom-replace tub tile flooring and install electrical heating floor system. 2nd floor bathroom remodel; replace new tile, drywall, shower pan and heated floor system. install recessed lighing at living room, family room and entry.Details
replace kitchen cabinet, drywall, counter tops. remodel master bathroom-replace tub tile flooring and install electrical heating floor system. 2nd floor bathroom remodel; replace new tile, drywall, shower pan and heated floor system. install recessed lighing at living room, family room and entry. | $15,000 |
| Oct 3, 2014 | Completed final sign-off Mar 2016 | 358 Ocean Av | comply with 201491812. scope is limited to the in kind replacement of limited area of fire damaged exterior and interior walls and doors. work includes replacement in kind of toilet fixtures, kitchen fixutres, appliances. includes plumbing and elecDetails
comply with 201491812. scope is limited to the in kind replacement of limited area of fire damaged exterior and interior walls and doors. work includes replacement in kind of toilet fixtures, kitchen fixutres, appliances. includes plumbing and elec | $25,000 |