Back to bathroom remodel contractors
Fortitude Construction Inc.
- Based in
- Campbell
- On San Francisco permits
- Feb 2014 to Dec 2018
- Last 24 months
- 0 permits filed
22 permits since 2000: 16 completed, 3 never finaled, 3 expired or cancelled.
Of the 3 never-finaled permits, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 4 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 221 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 13, 2018 | Completed final sign-off May 2022 | 1033 Sanchez St | remodel of a basement into an additional dwelling unit per ord 162-17: 2 bdrm, 2 bath 1485 sq ft habitable space. relocate (e) laundry & utility rm for bldg. 1-3 bicycle parking spaces.Details
remodel of a basement into an additional dwelling unit per ord 162-17: 2 bdrm, 2 bath 1485 sq ft habitable space. relocate (e) laundry & utility rm for bldg. 1-3 bicycle parking spaces. | $35,000 |
| Apr 17, 2017 | Completed final sign-off Feb 2018 | 3714 23rd St | revision to pa#201701268008, remodel 4 bathrooms, 1 kitchen on upper unit.Details
revision to pa#201701268008, remodel 4 bathrooms, 1 kitchen on upper unit. | $20,000 |
| Feb 27, 2017 | Completed final sign-off Jul 2017 | 442 Vallejo St | bathroom remodel replace in kind only, new tub, fixture and faucets, new tile floor, wall, replace existing water heater with new (tankless), gas direct vent, high efficiency. all lighting high efficacy, (n) exhaust fan connect to (e) exhaust duct.Details
bathroom remodel replace in kind only, new tub, fixture and faucets, new tile floor, wall, replace existing water heater with new (tankless), gas direct vent, high efficiency. all lighting high efficacy, (n) exhaust fan connect to (e) exhaust duct. | $5,000 |
| Feb 12, 2016 | Expired or cancelled expired Apr 2018 | 510 Orizaba Av | replace kitchen cabinet, drywall, counter tops. remodel master bathroom-replace tub tile flooring and install electrical heating floor system. 2nd floor bathroom remodel; replace new tile, drywall, shower pan and heated floor system. install recessed lighing at living room, family room and entry.Details
replace kitchen cabinet, drywall, counter tops. remodel master bathroom-replace tub tile flooring and install electrical heating floor system. 2nd floor bathroom remodel; replace new tile, drywall, shower pan and heated floor system. install recessed lighing at living room, family room and entry. | $15,000 |
| Feb 3, 2014 | Completed final sign-off Apr 2014 | 2510 39th Av | main bathroom remodel, electrical and plumbing fixtures upgrade, new tile installation, sun touch heater flooring installation.Details
main bathroom remodel, electrical and plumbing fixtures upgrade, new tile installation, sun touch heater flooring installation. | $11,000 |