Back to kitchen remodel contractors
Fogarty James A
- Based in
- Millbrae
- On San Francisco permits
- Oct 2000 to Jul 2026
- Last 24 months
- 4 permits filed
44 permits since 2000: 37 completed, 4 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
5 kitchen remodel permits: 3 completed, 1 in progress, 1 expired or cancelled. Typically 8 days from filing to permit and 196 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 23, 2025 | In progress issued Jan 2026 | 4230 25th St | rear bldg: legalize one (e) unit at first flr of the (e) northwest single family bldg. the unit will be 1-bedroom unit w/ a kitchen and a bath. no work proposed on other, the legalized unit to be provided with nfpa 13r automatice fire sprinkler system under separate permit.Details
rear bldg: legalize one (e) unit at first flr of the (e) northwest single family bldg. the unit will be 1-bedroom unit w/ a kitchen and a bath. no work proposed on other, the legalized unit to be provided with nfpa 13r automatice fire sprinkler system under separate permit. | $150,000 |
| Jul 29, 2022 | Completed final sign-off Oct 2022 | 750 Great Hy | one kitchen remodel. remove existing cabinets. remove existing counter top. replace existing cabinets and counter top with new. install (5) new recessed lights in kitchen ceiling. non structural.Details
one kitchen remodel. remove existing cabinets. remove existing counter top. replace existing cabinets and counter top with new. install (5) new recessed lights in kitchen ceiling. non structural. | $15,000 |
| Dec 20, 2021 | Completed final sign-off Sep 2022 | 611 Washington St | remove existing cabinets and counter tops. replace with new cabinets and new quartz counter top in kitchen. replace existing hardwood flooring, replace with new flooring in kitchen. no wall layout changes.Details
remove existing cabinets and counter tops. replace with new cabinets and new quartz counter top in kitchen. replace existing hardwood flooring, replace with new flooring in kitchen. no wall layout changes. | $6,000 |
| Mar 15, 2021 | Completed final sign-off Nov 2021 | 2 San Fernando Wy | kitchen renovation-remove wall and install (n) steel beam.Details
kitchen renovation-remove wall and install (n) steel beam. | $40,000 |
| Mar 4, 2019 | Expired or cancelled expired Feb 2026 | 18 Joost Av | replace dry rot in bathroom & kitchen floorDetails
replace dry rot in bathroom & kitchen floor | $1,000 |