Back to bathroom remodel contractors
Fogarty James A
- Based in
- Millbrae
- On San Francisco permits
- Oct 2000 to Jul 2026
- Last 24 months
- 4 permits filed
44 permits since 2000: 37 completed, 4 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
8 bathroom remodel permits: 6 completed, 1 in progress, 1 expired or cancelled. Typically 0 days from filing to permit and 244 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 23, 2025 | In progress issued Jan 2026 | 4230 25th St | rear bldg: legalize one (e) unit at first flr of the (e) northwest single family bldg. the unit will be 1-bedroom unit w/ a kitchen and a bath. no work proposed on other, the legalized unit to be provided with nfpa 13r automatice fire sprinkler system under separate permit.Details
rear bldg: legalize one (e) unit at first flr of the (e) northwest single family bldg. the unit will be 1-bedroom unit w/ a kitchen and a bath. no work proposed on other, the legalized unit to be provided with nfpa 13r automatice fire sprinkler system under separate permit. | $150,000 |
| Feb 15, 2023 | Completed final sign-off Dec 2023 | 2195 40th Av | 2/f: remodel/rearrange living, dining, bedrooms, and bath. add a full bath, removed walls and add flat skylights. 1/f: add 2 bedrooms, a full bath. replace/add new windows/doors with aluminum clad wood windows/doors. repair siding, replace waster heater and furnance. upgrade electrical/plumbing.Details
2/f: remodel/rearrange living, dining, bedrooms, and bath. add a full bath, removed walls and add flat skylights. 1/f: add 2 bedrooms, a full bath. replace/add new windows/doors with aluminum clad wood windows/doors. repair siding, replace waster heater and furnance. upgrade electrical/plumbing. | $100,000 |
| Sep 29, 2021 | Completed final sign-off Jan 2022 | 108 Carl St | replace e dryrot in bathroom due to water damage in residential unit.Details
replace e dryrot in bathroom due to water damage in residential unit. | $2,000 |
| Mar 4, 2019 | Expired or cancelled expired Feb 2026 | 18 Joost Av | replace dry rot in bathroom & kitchen floorDetails
replace dry rot in bathroom & kitchen floor | $1,000 |
| May 11, 2018 | Completed final sign-off Jul 2018 | 762 Guerrero St | remodel existing bathrooms (2)Details
remodel existing bathrooms (2) | $5,000 |
| Mar 9, 2018 | Completed final sign-off Oct 2019 | 155 29th St | revision to 201412053112. reduce size of lightwell. rearrange stairs and bathDetails
revision to 201412053112. reduce size of lightwell. rearrange stairs and bath | |
| Dec 5, 2014 | Completed final sign-off Oct 2019 | 155 29th St | horizontal & vertical addition. add 1-bedroom & 3-bath in unit 1; add 1- bedroom & 3-bath in unit 2. mech, elec, plumbing & fire sprinkler under separate permit.Details
horizontal & vertical addition. add 1-bedroom & 3-bath in unit 1; add 1- bedroom & 3-bath in unit 2. mech, elec, plumbing & fire sprinkler under separate permit. | $600,000 |
| Oct 22, 2013 | Completed final sign-off May 2014 | 2397 Diamond St | revision to pa# 2012-1019-2453-bathroom layout, windows, doors & wet bar per plansDetails
revision to pa# 2012-1019-2453-bathroom layout, windows, doors & wet bar per plans | $1,000 |