Fog Horn Builders Inc
- Based in
- San Francisco
- On San Francisco permits
- Feb 2006 to Apr 2026
- Last 24 months
- 3 permits filed
39 permits since 2000: 33 completed, 2 in progress, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
5 stairs permits: 4 completed, 1 in progress. Typically 16 days from filing to permit and 129 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 29, 2026 | In progress issued Feb 2026 | 2467 35th Av | add 2nd fl deck & stair to grade. remove (e) stair & infill corner of bldg on both floors. at 1st floor relocate bathroom & add powder room; add mudroom w/kitchenette; (e) bedroom to be enlarged & family room to remain. ref pa 9405612 for ground floor (e) conditions; at 2nd floor remodel & enlargeDetails
add 2nd fl deck & stair to grade. remove (e) stair & infill corner of bldg on both floors. at 1st floor relocate bathroom & add powder room; add mudroom w/kitchenette; (e) bedroom to be enlarged & family room to remain. ref pa 9405612 for ground floor (e) conditions; at 2nd floor remodel & enlarge | $299,026 |
| Apr 18, 2024 | Completed final sign-off Jul 2024 | 3345 Judah St | remove amd replace stucco at front of house. replace rot at bay window and west stair wall. three windows replacement u-factor 0.30 max.Details
remove amd replace stucco at front of house. replace rot at bay window and west stair wall. three windows replacement u-factor 0.30 max. | $15,000 |
| Mar 24, 2016 | Completed final sign-off Jan 2017 | 2037 Scott St | connect (e) lower level rooms to upper level with a new internal staircase. new bathroom w/sink & tub, family room downstairs opening (as a door) to rear yard. 2nd floor - convert study room to bedroom. maher na.Details
connect (e) lower level rooms to upper level with a new internal staircase. new bathroom w/sink & tub, family room downstairs opening (as a door) to rear yard. 2nd floor - convert study room to bedroom. maher na. | $50,000 |
| Feb 16, 2016 | Completed final sign-off Mar 2016 | 635 Page St | replace in kind one flight of exterior stairs with handrail for required means of egress. maher naDetails
replace in kind one flight of exterior stairs with handrail for required means of egress. maher na | $4,000 |
| Nov 26, 2008 | Completed final sign-off Sep 2009 | 830 46th Av | revise app: 200801162622, revise interior stairs, add skylight, revise roof line at rear, add 2 fixed attic windows, relocate concrete step on foundation planDetails
revise app: 200801162622, revise interior stairs, add skylight, revise roof line at rear, add 2 fixed attic windows, relocate concrete step on foundation plan | $10,000 |