Back to kitchen remodel contractors
Fog Horn Builders Inc
- Based in
- San Francisco
- On San Francisco permits
- Feb 2006 to Apr 2026
- Last 24 months
- 3 permits filed
39 permits since 2000: 33 completed, 2 in progress, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
11 kitchen remodel permits: 9 completed, 2 in progress. Typically 16 days from filing to permit and 185 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 22, 2026 | In progress issued May 2026 | 2037 14th Av | kitchen & bath remodel. legalize lower room at garage level (260 sqft). add bathroom at lower level. voluntary seismic strengthening both levelsDetails
kitchen & bath remodel. legalize lower room at garage level (260 sqft). add bathroom at lower level. voluntary seismic strengthening both levels | $160,000 |
| Jan 29, 2026 | In progress issued Feb 2026 | 2467 35th Av | add 2nd fl deck & stair to grade. remove (e) stair & infill corner of bldg on both floors. at 1st floor relocate bathroom & add powder room; add mudroom w/kitchenette; (e) bedroom to be enlarged & family room to remain. ref pa 9405612 for ground floor (e) conditions; at 2nd floor remodel & enlargeDetails
add 2nd fl deck & stair to grade. remove (e) stair & infill corner of bldg on both floors. at 1st floor relocate bathroom & add powder room; add mudroom w/kitchenette; (e) bedroom to be enlarged & family room to remain. ref pa 9405612 for ground floor (e) conditions; at 2nd floor remodel & enlarge | $299,026 |
| Oct 20, 2023 | Completed final sign-off Jun 2024 | 2039 Greenwich St | remodel (e) kitchen area into the entry room & replace cabinets, build new bathroom, enlarge closets in bedrooms 1&2Details
remodel (e) kitchen area into the entry room & replace cabinets, build new bathroom, enlarge closets in bedrooms 1&2 | $35,000 |
| Sep 11, 2023 | Completed final sign-off Mar 2024 | 2463 35th Av | remodel (1) existing bathroom and 1 kitchen. all replacement in kind. kitchen 9x10, bath 8x6, total 138 sfDetails
remodel (1) existing bathroom and 1 kitchen. all replacement in kind. kitchen 9x10, bath 8x6, total 138 sf | $60,000 |
| Feb 25, 2022 | Completed final sign-off Jun 2022 | 779 38th Av | in-kind replace kitchen cabinet, ceiling, flooring, & lighting. plumbing to be modified as req for sink & (n) built-in dishwasher. electrical supply & outlets to be upgraded. replace 2 existing windows and side door.Details
in-kind replace kitchen cabinet, ceiling, flooring, & lighting. plumbing to be modified as req for sink & (n) built-in dishwasher. electrical supply & outlets to be upgraded. replace 2 existing windows and side door. | $55,000 |
| Oct 21, 2020 | Completed final sign-off Feb 2022 | 1795 35th Av | to comply with nov 2020051831 & 201902351: fire damage repair: new exterior stucco along s/s of structure, replace studs and joist at south half of g/f. rmeodel bath & kitchen.Details
to comply with nov 2020051831 & 201902351: fire damage repair: new exterior stucco along s/s of structure, replace studs and joist at south half of g/f. rmeodel bath & kitchen. | $180,000 |
| Jan 9, 2020 | Completed final sign-off Dec 2020 | 2139 Pierce St | replace and repair finishes in unit # 6 due to soft story work. kitchen and bathroom remodel. no floor plan change.Details
replace and repair finishes in unit # 6 due to soft story work. kitchen and bathroom remodel. no floor plan change. | $35,000 |
| Oct 4, 2018 | Completed final sign-off Dec 2018 | 102 Everson St | kitchen remodel, update lighting & electricalDetails
kitchen remodel, update lighting & electrical | $25,000 |
| Nov 1, 2016 | Completed final sign-off Aug 2017 | 230 Bella Vista Wy | remodel kitchen and dining room on level 2Details
remodel kitchen and dining room on level 2 | $20,000 |
| May 8, 2015 | Completed final sign-off Mar 2016 | 20 Lenox Wy | ground fl remodel to include bedroom, family room, office, full bath. 2nd fl open wall at kitchen, add 1/2 bathDetails
ground fl remodel to include bedroom, family room, office, full bath. 2nd fl open wall at kitchen, add 1/2 bath | $50,000 |
| Jan 17, 2012 | Completed final sign-off Jun 2012 | 70 Garcia Av | 1st floor:convert hallway behind garage to laundry area. 2nd floor: remodel kitchen/breakfas/laundry area to new kitchen/breakfast room. install new cabinets, appliances, direct vent stove windows and skylight, enclose 6 sq ft triangular area at rear elevation.Details
1st floor:convert hallway behind garage to laundry area. 2nd floor: remodel kitchen/breakfas/laundry area to new kitchen/breakfast room. install new cabinets, appliances, direct vent stove windows and skylight, enclose 6 sq ft triangular area at rear elevation. | $24,000 |