Back to bathroom remodel contractors
Flmc Development Corp Dba Adamo Campagna
- Based in
- Pacifica
- On San Francisco permits
- Oct 2002 to Jul 2026
- Last 24 months
- 22 permits filed
149 permits since 2000: 100 completed, 17 in progress, 17 never finaled, 15 expired or cancelled.
Of the 17 never-finaled permits, 6 are 3 to 5 years old, 5 are 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
43 bathroom remodel permits: 33 completed, 1 in progress, 2 never finaled, 7 expired or cancelled. Typically 3 days from filing to permit and 406 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 31, 2026 | In progress issued Sep 2026 | 58 Digby St | shear wall relocation and enlargement- remove and replace gypsum wall board on interior side of exterior walls to add insulation and upgrade electrical wiring- update bathroom fixtures and finishes in the upper floor bathroom, reconfigure the closet in the den/office- relocate micorwave/ oven & nookDetails
shear wall relocation and enlargement- remove and replace gypsum wall board on interior side of exterior walls to add insulation and upgrade electrical wiring- update bathroom fixtures and finishes in the upper floor bathroom, reconfigure the closet in the den/office- relocate micorwave/ oven & nook | $39,624 |
| Jan 29, 2024 | Completed final sign-off Mar 2026 | 3468 16th St | unit 3468: new additional bathroom, renovate existing bathrooom, remove closet in bedroom and remodel kitchen at 2nd flDetails
unit 3468: new additional bathroom, renovate existing bathrooom, remove closet in bedroom and remodel kitchen at 2nd fl | $15,000 |
| Nov 17, 2023 | Completed final sign-off Mar 2024 | 10 Miller Pl | replace in kind two bathroom. doing all electrical and plumbing up to code. non structuralDetails
replace in kind two bathroom. doing all electrical and plumbing up to code. non structural | $7,000 |
| Feb 28, 2023 | Completed final sign-off Mar 2023 | 4076 26th St | revision tp 2022-1003-3626 change (n) bathroom to future bathroomDetails
revision tp 2022-1003-3626 change (n) bathroom to future bathroom | |
| Feb 10, 2023 | Completed final sign-off Mar 2024 | 1772 Vallejo St | demo bathrom and powder room to accomplish permit number 202211035844: voluntary seismic upgrade. replace in kind on ground floor: bathroom and one powder room. replace in kind laundry room.Details
demo bathrom and powder room to accomplish permit number 202211035844: voluntary seismic upgrade. replace in kind on ground floor: bathroom and one powder room. replace in kind laundry room. | $10,000 |
| Oct 25, 2022 | Never finaled issued Oct 2022, no final | 3470 16th St | renovate in kind 2 bathrooms. drop plaster in dining room, 2 bedrooms, living room to upgrade insulation and add electrical. remove knob and tubes. no physical changes all replace in kind. no structural work under this permit; total area of work is 950 sfDetails
renovate in kind 2 bathrooms. drop plaster in dining room, 2 bedrooms, living room to upgrade insulation and add electrical. remove knob and tubes. no physical changes all replace in kind. no structural work under this permit; total area of work is 950 sf | $30,000 |
| Oct 19, 2022 | Completed final sign-off Dec 2024 | 38 Rossi Av | minor lower level reconfiguration. bathroom addition and storage conversion into media room. infill of lightwells against blind wall at first two levels. minor adjustment of door openings at level 2. reconfigure powder room at level 2.Details
minor lower level reconfiguration. bathroom addition and storage conversion into media room. infill of lightwells against blind wall at first two levels. minor adjustment of door openings at level 2. reconfigure powder room at level 2. | $103,000 |
| Oct 13, 2022 | Completed final sign-off Apr 2023 | 652 Guerrero St | site revision to previous boa 2021-1029-1438 1st floor work only; relocate water heaters; reconfigure bathroom, wetbar & storage layout; exterior changes @ rearDetails
site revision to previous boa 2021-1029-1438 1st floor work only; relocate water heaters; reconfigure bathroom, wetbar & storage layout; exterior changes @ rear | |
| Oct 3, 2022 | Completed final sign-off Mar 2023 | 4076 26th St | rev to pa 202207057717 consisting of = 1) bathroom @ ground floor 2) clarification to pa 202106253265 and 202112063793 to reflect (n) walls 3) clarify location of wall repair in storage 4) replace siding at rear of building.Details
rev to pa 202207057717 consisting of = 1) bathroom @ ground floor 2) clarification to pa 202106253265 and 202112063793 to reflect (n) walls 3) clarify location of wall repair in storage 4) replace siding at rear of building. | $20,000 |
| Jul 5, 2022 | Completed final sign-off Mar 2023 | 4076 26th St | revision to bpa#202106253265 & 202112063793. bathroom expansion @ main floor, new powder room @ main floor, add storage room & lobby area @ basement, reconfigure framing planDetails
revision to bpa#202106253265 & 202112063793. bathroom expansion @ main floor, new powder room @ main floor, add storage room & lobby area @ basement, reconfigure framing plan | $30,000 |
| Feb 11, 2022 | Completed final sign-off Apr 2024 | 2117 Broadway | 3/f. kitchen reconfiguration. infill door openings to dining room. 4/f-primary bathroom reconfiguration. bedroom 3 conversion into primary closet and bedroom reconfiguration. (bedroom 2) 5/f - wetbar addition and closet reconfiguration.Details
3/f. kitchen reconfiguration. infill door openings to dining room. 4/f-primary bathroom reconfiguration. bedroom 3 conversion into primary closet and bedroom reconfiguration. (bedroom 2) 5/f - wetbar addition and closet reconfiguration. | $165,000 |
| Jan 31, 2022 | Expired or cancelled cancelled Jan 2026 | 3466 16th St | (e) 1st fl space for adu legalization to include studio, bathroom & kitchen. sprinkler per nfpa 13r and sprinkler monitoring per nfpa 72 under sep permits.Details
(e) 1st fl space for adu legalization to include studio, bathroom & kitchen. sprinkler per nfpa 13r and sprinkler monitoring per nfpa 72 under sep permits. | $50,000 |
| Oct 29, 2021 | Completed final sign-off Apr 2023 | 652 Guerrero St | remodel of bldg storage behind garage. to add a web bar & half bath. relocation.Details
remodel of bldg storage behind garage. to add a web bar & half bath. relocation. | $70,000 |
| Apr 28, 2021 | Completed final sign-off Nov 2021 | 2550 Lyon St | bathroom -master bath remodel in kind, kitchen remodel in kind no structural walls being movedDetails
bathroom -master bath remodel in kind, kitchen remodel in kind no structural walls being moved | $95,000 |
| Feb 16, 2021 | Completed final sign-off Jan 2025 | 159 10th Av | addition & remodel of single family dwelling including kitchen, powder rm, family rm, master bath, laundry & half bath. (2) additions: 2nd fl infill on (e) structure. vertical ext of proposed 3rd fl addition is 15'-0" above (e) roof parapet & horizontal ext is 14'0". (2) decks proposed, rainDetails
addition & remodel of single family dwelling including kitchen, powder rm, family rm, master bath, laundry & half bath. (2) additions: 2nd fl infill on (e) structure. vertical ext of proposed 3rd fl addition is 15'-0" above (e) roof parapet & horizontal ext is 14'0". (2) decks proposed, rain | $325,000 |
| Dec 1, 2020 | Completed final sign-off Mar 2022 | 10 Miller Pl | #1702: repair/replace 3 windows & 2 patio doors with energy efficient windows & doors. not visible from street. replace kitchen cabinets & update appliances. remodel bathrooms. upgrade elec & plum. new light fixtures & finishes throughout.Details
#1702: repair/replace 3 windows & 2 patio doors with energy efficient windows & doors. not visible from street. replace kitchen cabinets & update appliances. remodel bathrooms. upgrade elec & plum. new light fixtures & finishes throughout. | $85,000 |
| Nov 20, 2020 | Never finaled issued Nov 2020, no final | 521 Liberty St | remodel (e) bathroom in kind, ff&e, no structural changesDetails
remodel (e) bathroom in kind, ff&e, no structural changes | $21,500 |
| Jul 1, 2020 | Completed final sign-off Jan 2021 | 320 Maple St | kitchen and bathroom remodel. replacing appliances and cabinetry in kitchen. kitchen size ~210sqft. replace toilet, vanity, and shower in master bath. bathroom size ~65 sqft. all work in kind and same location. no walls moved or relocated.Details
kitchen and bathroom remodel. replacing appliances and cabinetry in kitchen. kitchen size ~210sqft. replace toilet, vanity, and shower in master bath. bathroom size ~65 sqft. all work in kind and same location. no walls moved or relocated. | $25,000 |
| Nov 1, 2019 | Expired or cancelled withdrawn Jan 2021 | 2455 Vallejo St | change (e) single wide garage door to (n) narrow garage doors to match wester neighbor. horizontal addition. add (2)(n) bedroom, bathroom, closets & (n) playroom @ level 4Details
change (e) single wide garage door to (n) narrow garage doors to match wester neighbor. horizontal addition. add (2)(n) bedroom, bathroom, closets & (n) playroom @ level 4 | $250,000 |
| Aug 31, 2018 | Completed final sign-off Jun 2021 | 10 Miller Pl | replace in-kind (1) kitchen & bathroom, upgrade electrical & plumbing as required, all locations of fixtures to remain the same.Details
replace in-kind (1) kitchen & bathroom, upgrade electrical & plumbing as required, all locations of fixtures to remain the same. | $35,000 |
| Feb 27, 2018 | Completed final sign-off Oct 2019 | 3382 Clay St | revsion to app#201707273151. level 1: new slab to replace extg wood floor. level 2: minor adust to wall openings. level 3: reconfigure laundry bath 2. reconfigure bath 3 and new stair to replace old stair. level 4: relocation of bath. no exterior alteration aside from @ lightwellDetails
revsion to app#201707273151. level 1: new slab to replace extg wood floor. level 2: minor adust to wall openings. level 3: reconfigure laundry bath 2. reconfigure bath 3 and new stair to replace old stair. level 4: relocation of bath. no exterior alteration aside from @ lightwell | $10,000 |
| Feb 1, 2018 | Completed final sign-off Aug 2019 | 1717 Mason St | unit #6: interior renovation including extg bathrooms, extg kitchen, extg dining room, extg living room, extg bedrooms, one new toilet and 1 new shower, new led recess lights in hallway.Details
unit #6: interior renovation including extg bathrooms, extg kitchen, extg dining room, extg living room, extg bedrooms, one new toilet and 1 new shower, new led recess lights in hallway. | $25,000 |
| Jan 5, 2018 | Completed final sign-off Aug 2019 | 1717 Mason St | adding a market rate dwelling unit to include 2 bedrooms and 1 bath within building envelopeDetails
adding a market rate dwelling unit to include 2 bedrooms and 1 bath within building envelope | $100,000 |
| Nov 1, 2017 | Completed final sign-off Jan 2019 | 1112 Cole St | kitchen & bath replace in kind, bring (e) laundry to codeDetails
kitchen & bath replace in kind, bring (e) laundry to code | $35,000 |
| Jul 27, 2017 | Completed final sign-off Oct 2019 | 3382 Clay St | interior remodel- facade: no work. garage: no work. 1st fl - minor interior remodel, 2nd fl - minor interior remodel, minor door infill @ rear breakfast. level 3- lightwell infill and minor interior work. add bathroomDetails
interior remodel- facade: no work. garage: no work. 1st fl - minor interior remodel, 2nd fl - minor interior remodel, minor door infill @ rear breakfast. level 3- lightwell infill and minor interior work. add bathroom | $100,000 |
| Dec 16, 2016 | Completed final sign-off Feb 2021 | 1255 Bay St | horizontal & vertical addition, new front bay windows at level 2, 1st two levels, vertical addition of a new upper unit, level 1, new interior new elevator and bay window, reconstruction of bathroom at unit 1, level 3 & 4 new floors.Details
horizontal & vertical addition, new front bay windows at level 2, 1st two levels, vertical addition of a new upper unit, level 1, new interior new elevator and bay window, reconstruction of bathroom at unit 1, level 3 & 4 new floors. | $350,000 |
| Mar 23, 2016 | Completed final sign-off Jul 2017 | 10 Miller Pl | replace in-kind (1) kitchen & (2) bathrooms; all locations stay the same; upgrade electrical as necessary, including new subpanel; upgrade plumbing as necessary.Details
replace in-kind (1) kitchen & (2) bathrooms; all locations stay the same; upgrade electrical as necessary, including new subpanel; upgrade plumbing as necessary. | $35,000 |
| Feb 5, 2016 | Completed final sign-off Aug 2017 | 10 Miller Pl | replace in-kind (1) kitchen & (2) bathrooms, all locations are same, upgrade plumbing/electrical as necessary, install new subpanel.Details
replace in-kind (1) kitchen & (2) bathrooms, all locations are same, upgrade plumbing/electrical as necessary, install new subpanel. | $30,000 |
| Nov 5, 2015 | Completed final sign-off Jul 2017 | 10 Miller Pl | abatement of asbestos in all drywall & popcorn ceiling, replace in kind 4 bathrooms and 1 kitchen, reframe as necessary. frame soffits for electrical, rework hydronic heating, replace any necessary plumbing, rewire apt. and install 80 lights.Details
abatement of asbestos in all drywall & popcorn ceiling, replace in kind 4 bathrooms and 1 kitchen, reframe as necessary. frame soffits for electrical, rework hydronic heating, replace any necessary plumbing, rewire apt. and install 80 lights. | $10,000 |
| Sep 29, 2015 | Completed final sign-off Feb 2022 | 44 Elsie St | expending 2nd fl to include additional bedroom, bathroom & masterbathrm, 2 exterior decks & converting existing 1st level rm `a garage.Details
expending 2nd fl to include additional bedroom, bathroom & masterbathrm, 2 exterior decks & converting existing 1st level rm `a garage. | $105,000 |
| May 20, 2015 | Completed final sign-off Oct 2017 | 823 York St | single story addition with roof deck. remodel exist ground level space, new flooring, lighting mechanical, update (e) half bath, new gate at front.Details
single story addition with roof deck. remodel exist ground level space, new flooring, lighting mechanical, update (e) half bath, new gate at front. | $175,000 |
| Jan 3, 2014 | Completed final sign-off Feb 2014 | 650 Oak St | revision to permit #201312033238 to eliminate family room & bathroom at 1/f, revise lighting layout at 1/f. compliance with ordinance #155-13 not required.Details
revision to permit #201312033238 to eliminate family room & bathroom at 1/f, revise lighting layout at 1/f. compliance with ordinance #155-13 not required. | |
| Nov 18, 2013 | Expired or cancelled expired Apr 2022 | 38 Rossi Av | structural framing. dryrot repair. new laudnry room and closet on top floor.41 sq ft addition at master suite. remodel of extg master bath.Details
structural framing. dryrot repair. new laudnry room and closet on top floor.41 sq ft addition at master suite. remodel of extg master bath. | $15,000 |
| Aug 14, 2013 | Expired or cancelled expired Apr 2022 | 38 Rossi Av | repair water intrusion in the master bedroom & master closet. remove and replace plaster with new drywall. repair any dry rot if necessary. replace in kind master bathroom. upgrade electrical and plumbing as needed.Details
repair water intrusion in the master bedroom & master closet. remove and replace plaster with new drywall. repair any dry rot if necessary. replace in kind master bathroom. upgrade electrical and plumbing as needed. | $35,000 |
| Jan 23, 2013 | Completed final sign-off May 2013 | 930 Anza St | master bathroom remodel replace in-kind: remove old knob and tube wiring. new plumbing for shower, sink, toilet. no wall relocation. permanently installed lihting in bathroom shall comply with cec 150(k)10.Details
master bathroom remodel replace in-kind: remove old knob and tube wiring. new plumbing for shower, sink, toilet. no wall relocation. permanently installed lihting in bathroom shall comply with cec 150(k)10. | $20,000 |
| Dec 3, 2012 | Completed final sign-off Sep 2013 | 10 Miller Pl | suite 1802 - replace in kind two bathrooms & one kitchen, upgrade shower pans & electrical service. kitchen lighting: 50% of total wattage - high efficacy, bathroom lighting: high efficacy lights under controlled w/occupancy sensors.Details
suite 1802 - replace in kind two bathrooms & one kitchen, upgrade shower pans & electrical service. kitchen lighting: 50% of total wattage - high efficacy, bathroom lighting: high efficacy lights under controlled w/occupancy sensors. | $65,000 |
| Feb 1, 2012 | Completed final sign-off Apr 2012 | 63 Manchester St | replace in kind one kitchen, replace in kind one bathroom, upgrade electrical and plumbing when necessary, double drywall ceiling. no change on walls and openings.Details
replace in kind one kitchen, replace in kind one bathroom, upgrade electrical and plumbing when necessary, double drywall ceiling. no change on walls and openings. | $30,000 |
| Dec 29, 2010 | Completed final sign-off Dec 2011 | 123 Corbett Av | interior remodel at ground floor 440 sq ft habitable space for use as bedroom, study/guest bedroom, bathroom and hall.Details
interior remodel at ground floor 440 sq ft habitable space for use as bedroom, study/guest bedroom, bathroom and hall. | $50,000 |
| Dec 24, 2008 | Expired or cancelled expired Jun 2012 | 12 Prospect Av | to complete work and obtain final inspection for work approved under pa#200402236993. (add (n) 2 story rear yard addition (stair) add (n) bath & finishes in (e) area @ 1st floor. expand deck)Details
to complete work and obtain final inspection for work approved under pa#200402236993. (add (n) 2 story rear yard addition (stair) add (n) bath & finishes in (e) area @ 1st floor. expand deck) | $10,000 |
| Dec 19, 2008 | Completed final sign-off Dec 2009 | 88 King St | work on unit#1017. replace tile, fixtures, toilet, lav in both 2 bathrooms. install new hardwood floor, all work within unit. paint. no relocation of drain pipes in slab.Details
work on unit#1017. replace tile, fixtures, toilet, lav in both 2 bathrooms. install new hardwood floor, all work within unit. paint. no relocation of drain pipes in slab. | $40,000 |
| Dec 6, 2007 | Expired or cancelled expired Jul 2009 | 1998 Broadway | work @ unit# 1106 only. replace in kind. 1 kitchen & 2 bathrooms. replace kitchen with new cabinets & new appliances. add lighting & bring up to code electrically. replace 2 bathrooms with new tile & bring electrical & plumging up to code.Details
work @ unit# 1106 only. replace in kind. 1 kitchen & 2 bathrooms. replace kitchen with new cabinets & new appliances. add lighting & bring up to code electrically. replace 2 bathrooms with new tile & bring electrical & plumging up to code. | $30,000 |
| Oct 31, 2006 | Completed final sign-off Apr 2007 | 1847 47th Av | remodel kitchen & bathroom-flourscent lighting.Details
remodel kitchen & bathroom-flourscent lighting. | $10,000 |
| Oct 25, 2002 | Expired or cancelled expired Jun 2004 | 27 Digby St | remodel kitchen/3 bathrooms/install pocket doorsDetails
remodel kitchen/3 bathrooms/install pocket doors | $55,000 |