First Restaurant Builders
- Based in
- Piedmont
- On San Francisco permits
- Aug 2013 to May 2026
- Last 24 months
- 10 permits filed
34 permits since 2000: 24 completed, 1 in progress, 3 never finaled, 6 expired or cancelled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
8 kitchen remodel permits: 6 completed, 2 expired or cancelled. Typically 82 days from filing to permit and 146 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 2, 2024 | Completed final sign-off Jun 2025 | 1210 09th Av | change of use from retail to restaurant. int. remodel of a vacant g/f retail space into a new restaurant space, including new non-rated int. partitions, new finishes, lighting, plumbing, and electrical scope in kitchen area. ext. changes include new painting and signage (sign under separate permit)Details
change of use from retail to restaurant. int. remodel of a vacant g/f retail space into a new restaurant space, including new non-rated int. partitions, new finishes, lighting, plumbing, and electrical scope in kitchen area. ext. changes include new painting and signage (sign under separate permit) | $250,000 |
| Oct 7, 2024 | Completed final sign-off Jun 2025 | 1261 Stockton St | change of use from retail to restaurant. new rooftop unit. electrical panel replacement. tenant improvement new dining, restroom and kitchen.Details
change of use from retail to restaurant. new rooftop unit. electrical panel replacement. tenant improvement new dining, restroom and kitchen. | $350,000 |
| Apr 21, 2023 | Completed final sign-off Aug 2023 | 579 Howard St | change of ownership. equipment replacement proposed, equipment utility consumption shall be less than or equal with the (e) equipment. (e) kitchen hood to remain. hood/duct fire suppression system under separate permit. max occ load 49 persons.Details
change of ownership. equipment replacement proposed, equipment utility consumption shall be less than or equal with the (e) equipment. (e) kitchen hood to remain. hood/duct fire suppression system under separate permit. max occ load 49 persons. | |
| Aug 3, 2021 | Completed final sign-off Dec 2022 | 1515 03rd St | t.i. of a new bubble and mike tea shop in an empty shell space. (n) ada restroom, kitchen, storage, and customer area. new fixtures and equipement as well.Details
t.i. of a new bubble and mike tea shop in an empty shell space. (n) ada restroom, kitchen, storage, and customer area. new fixtures and equipement as well. | $165,000 |
| Dec 23, 2020 | Completed final sign-off Sep 2022 | 481 36th Av | to comply with nov 202064861 / 202065191: 1/f:remodel/relocated bedrooms, add office, family room & 2 bath. 2/f: remodel kitchen dining, nook, add powder room, rebuilt interior stairs. 3/f:remodel bathroom, add 2 baths & skylight. replace&install windows per plan. all windows to be alum-wood clad.Details
to comply with nov 202064861 / 202065191: 1/f:remodel/relocated bedrooms, add office, family room & 2 bath. 2/f: remodel kitchen dining, nook, add powder room, rebuilt interior stairs. 3/f:remodel bathroom, add 2 baths & skylight. replace&install windows per plan. all windows to be alum-wood clad. | $165,000 |
| Mar 4, 2020 | Expired or cancelled expired Oct 2025 | 15 Clearfield Dr | remodel kitchen; replace cabinets, sink & floor tilesDetails
remodel kitchen; replace cabinets, sink & floor tiles | $15,000 |
| Jan 31, 2020 | Expired or cancelled expired Oct 2025 | 15 Clearfield Dr | 1st fl: add (1) (n) bath, (1) (n) bedrm & family room, relocate (1) bedrm, (1) bath, laundry & furnace. 2nd fl: reconfigure kitchen & replace skylight.Details
1st fl: add (1) (n) bath, (1) (n) bedrm & family room, relocate (1) bedrm, (1) bath, laundry & furnace. 2nd fl: reconfigure kitchen & replace skylight. | $100,000 |
| Jan 15, 2020 | Completed final sign-off May 2020 | 3269 22nd St | apt 3: remodel kitchen & 2 bathrooms. all work in-kind.Details
apt 3: remodel kitchen & 2 bathrooms. all work in-kind. | $33,000 |