Back to kitchen remodel contractors
Fire Detection Unlimited
- Based in
- Concord
- On San Francisco permits
- Apr 2003 to May 2026
- Last 24 months
- 28 permits filed
331 permits since 2000: 195 completed, 12 in progress, 88 never finaled, 36 expired or cancelled.
Of the 88 never-finaled permits, 5 are 3 to 5 years old, 27 are 5 to 10 years old, 56 are over 10 years old. 3 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 5 completed, 2 never finaled. Typically 0 days from filing to permit and 112 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 10, 2019 | Completed final sign-off Aug 2019 | 306 Broderick St | first floor: add monitoring of new kitchen hood system. all other existing devices to remain unless otherwise notedDetails
first floor: add monitoring of new kitchen hood system. all other existing devices to remain unless otherwise noted | $7,100 |
| May 24, 2018 | Completed final sign-off Nov 2018 | 855 Brannan St | suite b3 on 1st fl: ti to an existing fa system (1) supply fan rewiring duct detector & control for shut down. (2) new audible & visual occupant notification devices in common areas of ti space. monitoring of (1) kitchen hood ansul system. ref pa 2017-1016-1348Details
suite b3 on 1st fl: ti to an existing fa system (1) supply fan rewiring duct detector & control for shut down. (2) new audible & visual occupant notification devices in common areas of ti space. monitoring of (1) kitchen hood ansul system. ref pa 2017-1016-1348 | $9,903 |
| Apr 19, 2018 | Completed final sign-off Aug 2018 | 855 Brannan St | ste b3: ti of an (e) fci s3 fa panel. (1) supply fan requiring detection and control for shut down. new a/v's in common area of ti space. existing h/s relocated in ti space. monitoring of a new kitchen hood ansul system. (1) strove in common areas & h/s in common area of ti space. ref #201709077298.Details
ste b3: ti of an (e) fci s3 fa panel. (1) supply fan requiring detection and control for shut down. new a/v's in common area of ti space. existing h/s relocated in ti space. monitoring of a new kitchen hood ansul system. (1) strove in common areas & h/s in common area of ti space. ref #201709077298. | $17,404 |
| Sep 2, 2015 | Completed final sign-off Apr 2019 | 1750 Mcallister St | rad project. 830 sq ft ground floor expansion at rear, exterior paint, (n) kitchen, bath, and finishes in residential units, repaving of parking lot. sprinkler, alarm, elevator deferred.Details
rad project. 830 sq ft ground floor expansion at rear, exterior paint, (n) kitchen, bath, and finishes in residential units, repaving of parking lot. sprinkler, alarm, elevator deferred. | $12,000,000 |
| Jun 18, 2012 | Completed final sign-off Aug 2012 | 1150 Ocean Av | 1st floor level, east bldg fire alarm system addition for whole foods market store - existing: e3 facp & directory annunciator, new: horn/strobes=22, strobes=19, smoke=1, duct detector= 5, heat detector =1, monitor for kitchen hood=6, pull station = 1, lcd annunciator=1.Details
1st floor level, east bldg fire alarm system addition for whole foods market store - existing: e3 facp & directory annunciator, new: horn/strobes=22, strobes=19, smoke=1, duct detector= 5, heat detector =1, monitor for kitchen hood=6, pull station = 1, lcd annunciator=1. | $30,297 |
| Sep 24, 2008 | Never finaled issued Sep 2008, no final | 306 Broderick St | smoke detection, audible visual, notification, monitoring of kitchen hood and 1 pull station will be added to existing building fire alarm system.Details
smoke detection, audible visual, notification, monitoring of kitchen hood and 1 pull station will be added to existing building fire alarm system. | $10,000 |
| Aug 7, 2006 | Never finaled issued Aug 2006, no final | 300 Broderick St | t-i to a-3 (partial), b, and m occupancies. full notification for all occupancies excepts a-3 which is not to be occupied. duct detectors located in a-3 and m occupancy spaces shall be monitored for supervisory conditions. kitchen hood shall be monitored in m occupancy for alarm condition. new remotDetails
t-i to a-3 (partial), b, and m occupancies. full notification for all occupancies excepts a-3 which is not to be occupied. duct detectors located in a-3 and m occupancy spaces shall be monitored for supervisory conditions. kitchen hood shall be monitored in m occupancy for alarm condition. new remot | $8,900 |