Back to bathroom remodel contractors
Fire Detection Unlimited
- Based in
- Concord
- On San Francisco permits
- Apr 2003 to May 2026
- Last 24 months
- 28 permits filed
331 permits since 2000: 195 completed, 12 in progress, 88 never finaled, 36 expired or cancelled.
Of the 88 never-finaled permits, 5 are 3 to 5 years old, 27 are 5 to 10 years old, 56 are over 10 years old. 3 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 3 completed, 1 expired or cancelled. Typically 12 days from filing to permit and 816 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 4, 2020 | Completed final sign-off Dec 2020 | 350 University St | adding and relocation of visual notificaiton devices in the newly remodled bathroom on the second floor.Details
adding and relocation of visual notificaiton devices in the newly remodled bathroom on the second floor. | $100,658 |
| Sep 20, 2018 | Completed final sign-off Dec 2020 | 350 University St | modification to an existing gamewell/fci e3 fa system. adding and relocating of visual notification devices in thenewly remodeled bathroom on the second floor.Details
modification to an existing gamewell/fci e3 fa system. adding and relocating of visual notification devices in thenewly remodeled bathroom on the second floor. | $9,776 |
| Sep 2, 2015 | Completed final sign-off Apr 2019 | 1750 Mcallister St | rad project. 830 sq ft ground floor expansion at rear, exterior paint, (n) kitchen, bath, and finishes in residential units, repaving of parking lot. sprinkler, alarm, elevator deferred.Details
rad project. 830 sq ft ground floor expansion at rear, exterior paint, (n) kitchen, bath, and finishes in residential units, repaving of parking lot. sprinkler, alarm, elevator deferred. | $12,000,000 |
| Aug 19, 2015 | Expired or cancelled expired Oct 2019 | 350 University St | adding new notification devices in new remodeled 1st flr: bathroom. 8 new notification devicesDetails
adding new notification devices in new remodeled 1st flr: bathroom. 8 new notification devices | $2,000 |