Back to kitchen remodel contractors
Finian Norris Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2002 to May 2015
- Last 24 months
- 0 permits filed
22 permits since 2000: 20 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 2 completed, 1 never finaled. Typically 0 days from filing to permit and 253 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 27, 2015 | Completed final sign-off Jun 2016 | 1245 32nd Av | 1) convert closet to a bath room in bedrm. 2)new kitchen cabinet, & remove 1 non bearing wall. 3) replace all extg single pane windows with vinyl framed dbl pane windows. 4)remove brick fire place and chimney.Details
1) convert closet to a bath room in bedrm. 2)new kitchen cabinet, & remove 1 non bearing wall. 3) replace all extg single pane windows with vinyl framed dbl pane windows. 4)remove brick fire place and chimney. | $50,000 |
| Nov 25, 2014 | Never finaled issued Nov 2014, no final | 1245 32nd Av | remodel of kitchen & bathroom in same location. change fixtures, floor, wall tiles in bathroom, and fixtures, floor tile & countertops in kitchen. upgrade plumbing and electrical in both rooms as required.Details
remodel of kitchen & bathroom in same location. change fixtures, floor, wall tiles in bathroom, and fixtures, floor tile & countertops in kitchen. upgrade plumbing and electrical in both rooms as required. | $38,000 |
| Jul 1, 2014 | Completed final sign-off Nov 2014 | 1239 32nd Av | remodel of kitchen, bathroom in same location. change out fixtures & floor & wall tiles in bathroom, change out fixtures & floor & chouter tops in ktichen. repaint boht rooms.Details
remodel of kitchen, bathroom in same location. change out fixtures & floor & wall tiles in bathroom, change out fixtures & floor & chouter tops in ktichen. repaint boht rooms. | $36,000 |