Finian Norris Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2002 to May 2015
- Last 24 months
- 0 permits filed
22 permits since 2000: 20 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
6 deck permits: 6 completed. Typically 186 days from filing to permit and 96 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 9, 2011 | Completed final sign-off Jan 2014 | 15 Carl St | existing 2 story deck to be removed. new 2 story deck to be constructed with stairs to the rear of the deck instead of at the side.Details
existing 2 story deck to be removed. new 2 story deck to be constructed with stairs to the rear of the deck instead of at the side. | $20,000 |
| Aug 20, 2010 | Completed final sign-off Jun 2011 | 3839 17th St | replace (e) 3 story rear deck w/(n) 3 story rear deck in kind. same height, length, depth.Details
replace (e) 3 story rear deck w/(n) 3 story rear deck in kind. same height, length, depth. | $17,000 |
| Apr 6, 2010 | Completed final sign-off Nov 2010 | 1472 Dolores St | (n) rear deck @ 2nd. level. (n) spiral stair from deck to grade. (n) door to replace (e) window.Details
(n) rear deck @ 2nd. level. (n) spiral stair from deck to grade. (n) door to replace (e) window. | $5,500 |
| Apr 9, 2009 | Completed final sign-off May 2010 | 225 Teresita Bl | add new upper and lower decks on rear of structure. change window to french doors.Details
add new upper and lower decks on rear of structure. change window to french doors. | $18,500 |
| Oct 30, 2003 | Completed final sign-off Dec 2003 | 139 Dolores St | repairs to existing deck & stairs - primarily involving 2 by 6 redwood decking & some joists due toDetails
repairs to existing deck & stairs - primarily involving 2 by 6 redwood decking & some joists due to | $2,000 |
| Oct 9, 2002 | Completed final sign-off Sep 2004 | 3877 17th St | new deck & stairsDetails
new deck & stairs | $7,000 |