Field Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Sep 2026
- Last 24 months
- 119 permits filed
1,520 permits since 2000: 1,208 completed, 46 in progress, 105 never finaled, 161 expired or cancelled.
Of the 105 never-finaled permits, 5 are 3 to 5 years old, 33 are 5 to 10 years old, 67 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
3 deck permits: 3 completed. Typically 39 days from filing to permit and 134 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 2, 2015 | Completed final sign-off Jun 2017 | 343 Sansome St | project consist of bringing existing balcony deck to accessibility and egress code compliance. existing tenant space is current vacant. mechanical, electrical, life safety and sprinkler system are under seperate permit. n/a ordinance #155-13Details
project consist of bringing existing balcony deck to accessibility and egress code compliance. existing tenant space is current vacant. mechanical, electrical, life safety and sprinkler system are under seperate permit. n/a ordinance #155-13 | $20,000 |
| Nov 14, 2012 | Completed final sign-off Feb 2013 | 1 Embarcadero Center | 22nd & 23rd floor-new convenience stair, structural framing & finishes. demolition of a portion of existing concrete & steel deck from fl 22 to 23 under pa #2012.11.14.4174.mep,fire alarm, and sprinkler rev under separate appls. change does require changes to the building smoke control sequence.Details
22nd & 23rd floor-new convenience stair, structural framing & finishes. demolition of a portion of existing concrete & steel deck from fl 22 to 23 under pa #2012.11.14.4174.mep,fire alarm, and sprinkler rev under separate appls. change does require changes to the building smoke control sequence. | $180,000 |
| Dec 23, 2002 | Completed final sign-off Jun 2003 | 505 Montgomery St | infill of e stair opening w/ concrete,fill and metal deck oti-1 200212/18/3791 for remodel, this isDetails
infill of e stair opening w/ concrete,fill and metal deck oti-1 200212/18/3791 for remodel, this is | $15,000 |