Back to kitchen remodel contractors
Fgv Construction Co
- Based in
- Richmond
- On San Francisco permits
- Mar 2022 to Sep 2026
- Last 24 months
- 10 permits filed
25 permits since 2000: 20 completed, 2 in progress, 3 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 6 completed, 1 in progress. Typically 0 days from filing to permit and 74 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 3, 2026 | In progress issued Sep 2026 | 230 Yale St | kitchen remodel in kind approx 98 sf. like for like. siding replacement: removing 4x8 sheet of siding (approx 500sf) on the left hand side of house and installing new hardy plank smooth siding.Details
kitchen remodel in kind approx 98 sf. like for like. siding replacement: removing 4x8 sheet of siding (approx 500sf) on the left hand side of house and installing new hardy plank smooth siding. | $24,500 |
| Mar 19, 2026 | Completed final sign-off May 2026 | 136 Mallorca Wy | bathroom remodel in kind like for like (no change tub to shower), 1 kitchen remodel in kind like for like, update electrical, upgrade plumbing.Details
bathroom remodel in kind like for like (no change tub to shower), 1 kitchen remodel in kind like for like, update electrical, upgrade plumbing. | $28,000 |
| Jun 12, 2025 | Completed final sign-off Sep 2025 | 50 Elsie St | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $22,000 |
| May 10, 2024 | Completed final sign-off Aug 2024 | 288 Roosevelt Wy | two bathroom remodel in kind like for like. includes rewiring entire unit. replace counter top in kitchenDetails
two bathroom remodel in kind like for like. includes rewiring entire unit. replace counter top in kitchen | $28,000 |
| Oct 30, 2023 | Completed final sign-off Jun 2024 | 286 Roosevelt Wy | two bathroom remodel in kind- replace kitchen counter in kind- update electric- tear out ceiling, drywall only whole unit. removed existing tile on front deck and replace tracks decking. removed existing wood railing front b/d with metal railing.Details
two bathroom remodel in kind- replace kitchen counter in kind- update electric- tear out ceiling, drywall only whole unit. removed existing tile on front deck and replace tracks decking. removed existing wood railing front b/d with metal railing. | $70,000 |
| Jan 27, 2023 | Completed final sign-off Mar 2023 | 59 Manchester St | kitchen remodel in kind. no changes to floor plans or walls.Details
kitchen remodel in kind. no changes to floor plans or walls. | $18,000 |
| Sep 26, 2022 | Completed final sign-off Nov 2022 | 70 Manchester St | kitchen and bath remodel and laundry. in kind no changes to floor plans or walls.Details
kitchen and bath remodel and laundry. in kind no changes to floor plans or walls. | $30,000 |