Back to bathroom remodel contractors
Fgv Construction Co
- Based in
- Richmond
- On San Francisco permits
- Mar 2022 to Sep 2026
- Last 24 months
- 10 permits filed
25 permits since 2000: 20 completed, 2 in progress, 3 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
12 bathroom remodel permits: 11 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 64 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 2, 2026 | Completed final sign-off Sep 2026 | 747 16th Av | all work at 749 16th ave, top floor: remodel two bathrooms in kind like for like. one of the bathroom has a bathtub + the other bathroom has a shower. each bathroom approx 45 sqft.Details
all work at 749 16th ave, top floor: remodel two bathrooms in kind like for like. one of the bathroom has a bathtub + the other bathroom has a shower. each bathroom approx 45 sqft. | $22,000 |
| Mar 19, 2026 | Completed final sign-off May 2026 | 136 Mallorca Wy | bathroom remodel in kind like for like (no change tub to shower), 1 kitchen remodel in kind like for like, update electrical, upgrade plumbing.Details
bathroom remodel in kind like for like (no change tub to shower), 1 kitchen remodel in kind like for like, update electrical, upgrade plumbing. | $28,000 |
| Aug 21, 2025 | Completed final sign-off Oct 2025 | 136 Mallorca Wy | unit 138: bathroom remodel in kind.Details
unit 138: bathroom remodel in kind. | $11,000 |
| Jun 12, 2025 | Completed final sign-off Sep 2025 | 50 Elsie St | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $22,000 |
| Feb 14, 2025 | Expired or cancelled cancelled Aug 2025 | 323 Byxbee St | to comply with nov 2024-31941 for fire damage repair; upgrade electric in two bedrooms and bathroom in kind; install drywall two bedrooms and bathroom update plumbing from (e) bathroom in kind, all work on garage level, no wall construction or demolition, no change in plumbing fixture count.Details
to comply with nov 2024-31941 for fire damage repair; upgrade electric in two bedrooms and bathroom in kind; install drywall two bedrooms and bathroom update plumbing from (e) bathroom in kind, all work on garage level, no wall construction or demolition, no change in plumbing fixture count. | $18,000 |
| May 10, 2024 | Completed final sign-off Aug 2024 | 288 Roosevelt Wy | two bathroom remodel in kind like for like. includes rewiring entire unit. replace counter top in kitchenDetails
two bathroom remodel in kind like for like. includes rewiring entire unit. replace counter top in kitchen | $28,000 |
| Dec 29, 2023 | Completed final sign-off Feb 2024 | 736 Great Hy | one bathroom remodel in kindDetails
one bathroom remodel in kind | $8,500 |
| Oct 30, 2023 | Completed final sign-off Jun 2024 | 286 Roosevelt Wy | two bathroom remodel in kind- replace kitchen counter in kind- update electric- tear out ceiling, drywall only whole unit. removed existing tile on front deck and replace tracks decking. removed existing wood railing front b/d with metal railing.Details
two bathroom remodel in kind- replace kitchen counter in kind- update electric- tear out ceiling, drywall only whole unit. removed existing tile on front deck and replace tracks decking. removed existing wood railing front b/d with metal railing. | $70,000 |
| Oct 19, 2023 | Completed final sign-off Dec 2023 | 83 Benton Av | bathroom remodeling in basement and make a french drain around the exterior of house. not visible from street. in kindDetails
bathroom remodeling in basement and make a french drain around the exterior of house. not visible from street. in kind | $12,000 |
| Oct 17, 2022 | Completed final sign-off Nov 2022 | 70 Manchester St | bathroom remodel replacing in-kind (bathroom #2)Details
bathroom remodel replacing in-kind (bathroom #2) | $7,500 |
| Sep 26, 2022 | Completed final sign-off Nov 2022 | 70 Manchester St | kitchen and bath remodel and laundry. in kind no changes to floor plans or walls.Details
kitchen and bath remodel and laundry. in kind no changes to floor plans or walls. | $30,000 |
| Mar 2, 2022 | Completed final sign-off May 2026 | 449 Pennsylvania Av | convert 1st floor to habitable spaces. extend existing first floor towards the rear. firsts floor will have two new bathrooms, a new study, new family room and new master bedroom. remodel second floor, raise roof three feet and build new deck at rear over first floor.Details
convert 1st floor to habitable spaces. extend existing first floor towards the rear. firsts floor will have two new bathrooms, a new study, new family room and new master bedroom. remodel second floor, raise roof three feet and build new deck at rear over first floor. | $49,999 |