Fg Force Construction Inc
- Based in
- Burlingame
- On San Francisco permits
- Oct 2017 to Sep 2026
- Last 24 months
- 11 permits filed
36 permits since 2000: 22 completed, 9 in progress, 2 never finaled, 3 expired or cancelled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
5 stairs permits: 3 completed, 2 in progress. Typically 83 days from filing to permit and 489 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 5, 2024 | In progress issued Sep 2024 | 1222 33rd Av | remodel 3rd fl bath. remodel 2nd fl kitchen. (n) habitable rooms on 1st fl with half bath. repair front exterior stairs.Details
remodel 3rd fl bath. remodel 2nd fl kitchen. (n) habitable rooms on 1st fl with half bath. repair front exterior stairs. | $77,322 |
| May 1, 2024 | In progress issued Jul 2024 | 151 Madison St | 1st fl create new study room, new family and kitchen, new wall btn garage and n habitable space.remove 1 struc column. relate w/h.furnace. 2nd remove wall betwn kitchn/lr.remodel kitchen,new struc beam,redesign interior stair,remode 2 e baths,move int wall.Details
1st fl create new study room, new family and kitchen, new wall btn garage and n habitable space.remove 1 struc column. relate w/h.furnace. 2nd remove wall betwn kitchn/lr.remodel kitchen,new struc beam,redesign interior stair,remode 2 e baths,move int wall. | $240,000 |
| Apr 12, 2024 | Completed final sign-off Feb 2025 | 742 17th Av | build new exterior stair in rear yard. build new deck on 1st fl; rebuild existing deck on 2nd flDetails
build new exterior stair in rear yard. build new deck on 1st fl; rebuild existing deck on 2nd fl | $12,000 |
| Apr 6, 2022 | Completed final sign-off Jan 2025 | 422 Moscow St | expand habitable square feet within (e) building envelope at 1st fl. new bathroom, 2 new bedrooms, new interior stair, new laundry, new wall separating garage.Details
expand habitable square feet within (e) building envelope at 1st fl. new bathroom, 2 new bedrooms, new interior stair, new laundry, new wall separating garage. | $34,000 |
| Aug 20, 2020 | Completed final sign-off Nov 2023 | 631 Kansas St | renovate (e) sfd. finish g/f to have new wetbar, bathrm, office, living rm, foyer. new stair connection to 2/f - reconfig. 2/f kitchen, add bathrm, add rear deck w/living space below. new roof deck, renovate ext. front & rear facade. horiz. expansion at rear 1/f. infill (e) lightwell. new bay windowDetails
renovate (e) sfd. finish g/f to have new wetbar, bathrm, office, living rm, foyer. new stair connection to 2/f - reconfig. 2/f kitchen, add bathrm, add rear deck w/living space below. new roof deck, renovate ext. front & rear facade. horiz. expansion at rear 1/f. infill (e) lightwell. new bay window | $275,000 |