Back to kitchen remodel contractors
Fg Force Construction Inc
- Based in
- Burlingame
- On San Francisco permits
- Oct 2017 to Sep 2026
- Last 24 months
- 11 permits filed
36 permits since 2000: 22 completed, 9 in progress, 2 never finaled, 3 expired or cancelled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
15 kitchen remodel permits: 8 completed, 5 in progress, 2 never finaled. Typically 30 days from filing to permit and 170 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 24, 2026 | In progress issued Apr 2026 | 150 Wilde Av | remodel of bathroom, remodel, in kind kitchen, new heat pump. new pocket door between kitchen and laundry. work in rear building.Details
remodel of bathroom, remodel, in kind kitchen, new heat pump. new pocket door between kitchen and laundry. work in rear building. | $75,000 |
| Mar 12, 2026 | In progress issued May 2026 | 1457 Broderick St | remodel kitchen, dining, and bathrooms; add wall in sunroom; add closet in front bedroomDetails
remodel kitchen, dining, and bathrooms; add wall in sunroom; add closet in front bedroom | $80,000 |
| Jun 30, 2025 | Completed final sign-off Oct 2025 | 934 Teresita Bl | windows replacement:to replace 7 windows, 2 @ front of the house & 5 windows @ back of the house located in the bathroom and kitchen area.notes: the bathroom & kitchen windows are to be retrofiting windows.the front of the house windows are to be new construction. new windows u-<0.3.Details
windows replacement:to replace 7 windows, 2 @ front of the house & 5 windows @ back of the house located in the bathroom and kitchen area.notes: the bathroom & kitchen windows are to be retrofiting windows.the front of the house windows are to be new construction. new windows u-<0.3. | $12,000 |
| Oct 31, 2024 | In progress issued Feb 2025 | 1459 Broderick St | 2/f -remodel kitchen, remodel bathrooms, add 1 new bedroom, build new closet, build (n) storage room on 1/f, replace (e) windows at all visible facades with aluminum wood-clad windows.Details
2/f -remodel kitchen, remodel bathrooms, add 1 new bedroom, build new closet, build (n) storage room on 1/f, replace (e) windows at all visible facades with aluminum wood-clad windows. | $40,000 |
| Aug 9, 2024 | Completed final sign-off Feb 2025 | 1131 Hampshire St | remodel kitchen to include removing non bearing walls and closet. remove chimeny and add full bathroom and closet. remodel (e) bathroom. addition of 3(n) skylights. all work on 2nd floor.Details
remodel kitchen to include removing non bearing walls and closet. remove chimeny and add full bathroom and closet. remodel (e) bathroom. addition of 3(n) skylights. all work on 2nd floor. | $39,500 |
| Jul 5, 2024 | In progress issued Sep 2024 | 1222 33rd Av | remodel 3rd fl bath. remodel 2nd fl kitchen. (n) habitable rooms on 1st fl with half bath. repair front exterior stairs.Details
remodel 3rd fl bath. remodel 2nd fl kitchen. (n) habitable rooms on 1st fl with half bath. repair front exterior stairs. | $77,322 |
| May 1, 2024 | In progress issued Jul 2024 | 151 Madison St | 1st fl create new study room, new family and kitchen, new wall btn garage and n habitable space.remove 1 struc column. relate w/h.furnace. 2nd remove wall betwn kitchn/lr.remodel kitchen,new struc beam,redesign interior stair,remode 2 e baths,move int wall.Details
1st fl create new study room, new family and kitchen, new wall btn garage and n habitable space.remove 1 struc column. relate w/h.furnace. 2nd remove wall betwn kitchn/lr.remodel kitchen,new struc beam,redesign interior stair,remode 2 e baths,move int wall. | $240,000 |
| Jan 11, 2024 | Completed final sign-off Dec 2025 | 1310 32nd Av | upper unit: kitchen remodel no changes to (e) locations new plumbing, new elec, upgrade all plumbing in the kitchen only and install two new heat pump water heaters, upgrade electrical (kitchen only)repair (e) main elec service to 200 amps main service, replace (2)(e) windows in kindDetails
upper unit: kitchen remodel no changes to (e) locations new plumbing, new elec, upgrade all plumbing in the kitchen only and install two new heat pump water heaters, upgrade electrical (kitchen only)repair (e) main elec service to 200 amps main service, replace (2)(e) windows in kind | $55,000 |
| May 8, 2023 | Completed final sign-off Mar 2024 | 742 17th Av | remove non loading bearing wall between kitchn and living room. add new beam to ceiling in living room. remodel existing kitchen and bath. new 1/2 bath in bedroomDetails
remove non loading bearing wall between kitchn and living room. add new beam to ceiling in living room. remodel existing kitchen and bath. new 1/2 bath in bedroom | $30,000 |
| Mar 24, 2023 | Never finaled issued Mar 2023, no final | 742 17th Av | upgrade 2 baths and kitchen in kind. new plumb, elec, drywall, tiles, cabinets. 6 new windows, 2 in kitchen, 2 in sunroom and one on each bath. not visible from street. all fixtures to be replaced to code. not visible from street.Details
upgrade 2 baths and kitchen in kind. new plumb, elec, drywall, tiles, cabinets. 6 new windows, 2 in kitchen, 2 in sunroom and one on each bath. not visible from street. all fixtures to be replaced to code. not visible from street. | $30,000 |
| Feb 2, 2023 | Never finaled issued Mar 2023, no final | 77 Carl St | remodel (e) kitchen. remove (e) wall between kitchen & dining room.Details
remodel (e) kitchen. remove (e) wall between kitchen & dining room. | $40,000 |
| Oct 22, 2020 | Completed final sign-off May 2021 | 338 Missouri St | all work at 3rd fl. kitchen & bathroom remodel, new windows in (e) opening, new closet doors, new lighting & electrical workDetails
all work at 3rd fl. kitchen & bathroom remodel, new windows in (e) opening, new closet doors, new lighting & electrical work | $40,000 |
| Aug 20, 2020 | Completed final sign-off Nov 2023 | 631 Kansas St | renovate (e) sfd. finish g/f to have new wetbar, bathrm, office, living rm, foyer. new stair connection to 2/f - reconfig. 2/f kitchen, add bathrm, add rear deck w/living space below. new roof deck, renovate ext. front & rear facade. horiz. expansion at rear 1/f. infill (e) lightwell. new bay windowDetails
renovate (e) sfd. finish g/f to have new wetbar, bathrm, office, living rm, foyer. new stair connection to 2/f - reconfig. 2/f kitchen, add bathrm, add rear deck w/living space below. new roof deck, renovate ext. front & rear facade. horiz. expansion at rear 1/f. infill (e) lightwell. new bay window | $275,000 |
| Jul 16, 2020 | Completed final sign-off Dec 2020 | 2701 40th Av | remove (e) vinyl windows & install (3) new marvin stone white clad windows, (1) window located at the back of the house, (1) window located at the kitchen area above the sink, (1) window located at the dining room. one of the windows faces wawona & 40th ave, at dining rm to be alumn clad from marvinDetails
remove (e) vinyl windows & install (3) new marvin stone white clad windows, (1) window located at the back of the house, (1) window located at the kitchen area above the sink, (1) window located at the dining room. one of the windows faces wawona & 40th ave, at dining rm to be alumn clad from marvin | $7,500 |
| Dec 26, 2019 | Completed final sign-off May 2020 | 75 Carl St | remove (e) wall at kitchen, install (n) beams, replace kitchen cabinets,replace interior window.Details
remove (e) wall at kitchen, install (n) beams, replace kitchen cabinets,replace interior window. | $30,000 |