Back to kitchen remodel contractors
Farallon General Contractors Inc.
- Based in
- Sausalito
- On San Francisco permits
- Feb 2008 to Aug 2026
- Last 24 months
- 7 permits filed
108 permits since 2000: 55 completed, 15 in progress, 31 never finaled, 7 expired or cancelled.
Of the 31 never-finaled permits, 4 are 3 to 5 years old, 14 are 5 to 10 years old, 13 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
25 kitchen remodel permits: 18 completed, 1 in progress, 5 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 228 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 12, 2023 | In progress issued Oct 2023 | 3368 Jackson St | kitchen and (1) bath remodel. replacement of appliances and fixtures. no change to electric or plumbing. in kind remodelgh: 4164231202Details
kitchen and (1) bath remodel. replacement of appliances and fixtures. no change to electric or plumbing. in kind remodelgh: 4164231202 | $10,000 |
| Jun 5, 2020 | Never finaled issued Jun 2020, no final | 3455 Washington St | remodel of (e) 298 sqft kitchen, 109 sqft level 2 bath #1, 45 sqft level 2 bath #2, 50 sqft level 3 bath #3, 47 sqft level 3 bath #4, and 280 sqft master bath all in-kind. refinish existing flooring and repair drywall as required for new electrical and plumbing.Details
remodel of (e) 298 sqft kitchen, 109 sqft level 2 bath #1, 45 sqft level 2 bath #2, 50 sqft level 3 bath #3, 47 sqft level 3 bath #4, and 280 sqft master bath all in-kind. refinish existing flooring and repair drywall as required for new electrical and plumbing. | $150,000 |
| Aug 15, 2019 | Completed final sign-off Apr 2022 | 2510 Green St | interior remodel only. demo and replace in kind interior finishes @ four level of existing single family residence. no exterior or structural work. remodel existing 3 bahtrooms, 1 powder room, 1 kitchen, remove any hazardous materioal. no additional plumbing fixtures added.no change to (e)floor planDetails
interior remodel only. demo and replace in kind interior finishes @ four level of existing single family residence. no exterior or structural work. remodel existing 3 bahtrooms, 1 powder room, 1 kitchen, remove any hazardous materioal. no additional plumbing fixtures added.no change to (e)floor plan | $42,000 |
| Sep 17, 2018 | Never finaled issued Sep 2018, no final | 2625 Scott St | remodel of existing 228 sqft kitchen, 20 sqft powder room, 40 sqft 1st floor bathroom, 72 sqft shared 2nd floor bathroom, and 80 sqft master bathroom in-kind. repaint interior and exterior, refinish existing flooring, replace existing window casements in existing openings.Details
remodel of existing 228 sqft kitchen, 20 sqft powder room, 40 sqft 1st floor bathroom, 72 sqft shared 2nd floor bathroom, and 80 sqft master bathroom in-kind. repaint interior and exterior, refinish existing flooring, replace existing window casements in existing openings. | $20,000 |
| Apr 26, 2018 | Completed final sign-off Jan 2019 | 2740 Pierce St | revision to pa#201801199097 including the addition of architectural & structural plans. add 1/2 bath @ entry level. layout changes to (e) kitchen and bahtrooms. replace windows not visible from street.Details
revision to pa#201801199097 including the addition of architectural & structural plans. add 1/2 bath @ entry level. layout changes to (e) kitchen and bahtrooms. replace windows not visible from street. | |
| Jan 19, 2018 | Completed final sign-off Jan 2019 | 2740 Pierce St | remodel of (e) kitchen in-kind, same location, new wiriing, plumbing, cabinets, fixtures/finishes; remodel main floor bath & master bath in-kind, same location, new finishes/fixtures; replace (2) laundry hook-upDetails
remodel of (e) kitchen in-kind, same location, new wiriing, plumbing, cabinets, fixtures/finishes; remodel main floor bath & master bath in-kind, same location, new finishes/fixtures; replace (2) laundry hook-up | $100,000 |
| Jul 30, 2015 | Completed final sign-off Feb 2017 | 20 16th Av | interior remodel of (e) kitchen 272sf (e) 1/f bathroom, 55sf, (e) 2/f master bath 60sf & (e) kids bathroom (50sf), replace all finishes including tile, drywall, new cabinets & fixtures - no structural work. no exterior work.Details
interior remodel of (e) kitchen 272sf (e) 1/f bathroom, 55sf, (e) 2/f master bath 60sf & (e) kids bathroom (50sf), replace all finishes including tile, drywall, new cabinets & fixtures - no structural work. no exterior work. | $120,000 |
| Jul 20, 2015 | Never finaled issued Jul 2015, no final | 233 Franconia St | the interior remodel of (e) kitchen, 1/f bath & 2/f bath in-kind. no structural or exterior work. remove (e) finishes, install new drywall, electrical, plumbing & cabinets & flooring. kitchen 120sf, bath 1 40sf, bath 2: 40sf.Details
the interior remodel of (e) kitchen, 1/f bath & 2/f bath in-kind. no structural or exterior work. remove (e) finishes, install new drywall, electrical, plumbing & cabinets & flooring. kitchen 120sf, bath 1 40sf, bath 2: 40sf. | $52,000 |
| Mar 19, 2015 | Completed final sign-off Dec 2016 | 1764 Dolores St | 362 sf horizontal addition to 1st fl @ rear, 86 sf horizontal addition to 2nd fl @ rear, interior remodel of kitchen & miscellaneous improvements to finishes throughout the house, create useable deck on top of 2nd fl addition.Details
362 sf horizontal addition to 1st fl @ rear, 86 sf horizontal addition to 2nd fl @ rear, interior remodel of kitchen & miscellaneous improvements to finishes throughout the house, create useable deck on top of 2nd fl addition. | $189,000 |
| Feb 5, 2015 | Completed final sign-off Sep 2018 | 2535 Laguna St | new rear yard addition (2 story over basement). window repair/replacement, seismic retrofit/upgrade. relocate some interior partitions, new 1/2 bath, remodel bathrooms and kitchen.Details
new rear yard addition (2 story over basement). window repair/replacement, seismic retrofit/upgrade. relocate some interior partitions, new 1/2 bath, remodel bathrooms and kitchen. | $150,000 |
| Oct 2, 2014 | Completed final sign-off Nov 2016 | 910 Clayton St | upper unit - select demolition of the (e) kitchen, powder room, master bath and 2/f hallway powder room; all work within envelop; no structural work, kitchen and bath remodel. to comply with cec2150.0(k)3 & 5Details
upper unit - select demolition of the (e) kitchen, powder room, master bath and 2/f hallway powder room; all work within envelop; no structural work, kitchen and bath remodel. to comply with cec2150.0(k)3 & 5 | $3,000 |
| Feb 13, 2014 | Completed final sign-off Mar 2015 | 3014 California St | demo portion of rear of house to increase open space. convert 824 sf of garage level unconditioned space to conditioned liv sp. remodel kitchen & family rm areas. no increase in footprint. (e) 2 car garage remains. no work to front of house. (n) windows @ rear & sides. voluntary struct strenghteningDetails
demo portion of rear of house to increase open space. convert 824 sf of garage level unconditioned space to conditioned liv sp. remodel kitchen & family rm areas. no increase in footprint. (e) 2 car garage remains. no work to front of house. (n) windows @ rear & sides. voluntary struct strenghtening | $97,000 |
| Mar 13, 2013 | Never finaled issued Mar 2013, no final | 1880 Jackson St | replace (e) fixtures, plumbing trim, kitchen appliances, kitchen counter top & back splash. all work in same locations as existing in kind.Details
replace (e) fixtures, plumbing trim, kitchen appliances, kitchen counter top & back splash. all work in same locations as existing in kind. | $25,000 |
| Mar 12, 2013 | Completed final sign-off Jan 2014 | 11 Commonwealth Av | kitchen expansion on 1st floor, infill area of kitchen expansion -remove stair from 1/f to basement, new powder rm, new family room, basement foundation & partial footings, new mud room in (e) garage, demo conc pad on back yard. add new wood deck 6" above grade in south east corner of property,Details
kitchen expansion on 1st floor, infill area of kitchen expansion -remove stair from 1/f to basement, new powder rm, new family room, basement foundation & partial footings, new mud room in (e) garage, demo conc pad on back yard. add new wood deck 6" above grade in south east corner of property, | $400,000 |
| May 27, 2011 | Never finaled issued May 2011, no final | 59 Manzanita Av | replace extg ground floor rear yard wndows with new doors.new skylights interior remodel to include finishes update, kitchen and bathroom remodel,new electrical and plmbg. new interior stair to replace extg. legalize wetbar.Details
replace extg ground floor rear yard wndows with new doors.new skylights interior remodel to include finishes update, kitchen and bathroom remodel,new electrical and plmbg. new interior stair to replace extg. legalize wetbar. | $170,000 |
| Dec 15, 2010 | Completed final sign-off Jun 2011 | 2950 Vallejo St | remodel of kitchen, remodel 1-half bath, remodel 4-full baths.Details
remodel of kitchen, remodel 1-half bath, remodel 4-full baths. | $67,000 |
| Dec 2, 2010 | Completed final sign-off May 2011 | 3643 Folsom St | 2nd fl remodel. new kitchen, bath, flooring, structural upgrades, windowsDetails
2nd fl remodel. new kitchen, bath, flooring, structural upgrades, windows | $95,000 |
| Jul 27, 2010 | Completed final sign-off Jan 2011 | 40 Florence St | remodel kitchen- change couner tops in kind, re-paint, re-stain floors, kitchen size approx 400 sq.ft.Details
remodel kitchen- change couner tops in kind, re-paint, re-stain floors, kitchen size approx 400 sq.ft. | $35,000 |
| Mar 22, 2010 | Completed final sign-off Aug 2010 | 135 Belgrave Av | kitchen & bathroom remodel. window installation ( 1 of 6 windows in front of the house). structural changes to interior walls.Details
kitchen & bathroom remodel. window installation ( 1 of 6 windows in front of the house). structural changes to interior walls. | $50,000 |
| Sep 21, 2009 | Completed final sign-off Dec 2009 | 164 Dolores St | kitchen & bathroom remodel - new floors, counters, cabinets (partial), new plumbing fixtures in existing location, w/orelocate, minor wall demolition.Details
kitchen & bathroom remodel - new floors, counters, cabinets (partial), new plumbing fixtures in existing location, w/orelocate, minor wall demolition. | $30,000 |
| Mar 10, 2009 | Completed final sign-off Jul 2009 | 771 Wisconsin St | kitchen remodel -cabinets, counter, hood vent. at least half of the lighting wattage in kitchen shall be fluorescent. samll sheetrock. bathroom remodel - tile shower (tub removed), new sink & toilet sheetrock. provide fluorescent light or o.s. in bathroom. no other work under this permit.Details
kitchen remodel -cabinets, counter, hood vent. at least half of the lighting wattage in kitchen shall be fluorescent. samll sheetrock. bathroom remodel - tile shower (tub removed), new sink & toilet sheetrock. provide fluorescent light or o.s. in bathroom. no other work under this permit. | $60,000 |
| Nov 3, 2008 | Expired or cancelled expired Feb 2011 | 2133 Filbert St | kitchen & bathroom remodel. replace new kitchen cabinets & appliances. replace new tile shower & tiled floor.Details
kitchen & bathroom remodel. replace new kitchen cabinets & appliances. replace new tile shower & tiled floor. | $75,000 |
| Jul 7, 2008 | Completed final sign-off Nov 2008 | 1322 Dolores St | new kitchen cabinets/counters. remodel (2) kitchens. remodel 2 bathrooms. paint, tile flooring, lighting/electrical/plumbing.Details
new kitchen cabinets/counters. remodel (2) kitchens. remodel 2 bathrooms. paint, tile flooring, lighting/electrical/plumbing. | $90,000 |
| Mar 13, 2008 | Completed final sign-off Sep 2008 | 2587 Post St | 3 kitchen remodels, 6 bathroom remodels, exterior paint, interior paint and new flooringDetails
3 kitchen remodels, 6 bathroom remodels, exterior paint, interior paint and new flooring | $248,000 |
| Feb 11, 2008 | Completed final sign-off Jun 2008 | 3923 Sacramento St | work in 3923a & b sacramento st. replace kitchen cabinets, counter, appliances, replace kitchen tile flooring, replace bathroom flooring, toilet, sink. interior/exterior paint. no changes to size of rooms.Details
work in 3923a & b sacramento st. replace kitchen cabinets, counter, appliances, replace kitchen tile flooring, replace bathroom flooring, toilet, sink. interior/exterior paint. no changes to size of rooms. | $75,000 |