Back to bathroom remodel contractors
Farallon General Contractors Inc.
- Based in
- Sausalito
- On San Francisco permits
- Feb 2008 to Aug 2026
- Last 24 months
- 7 permits filed
108 permits since 2000: 55 completed, 15 in progress, 31 never finaled, 7 expired or cancelled.
Of the 31 never-finaled permits, 4 are 3 to 5 years old, 14 are 5 to 10 years old, 13 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
27 bathroom remodel permits: 19 completed, 3 in progress, 4 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 160 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 19, 2025 | In progress issued Jun 2025 | 3015 Pacific Av | basement: foundation replacement. full renovation. (n) guest rm, bath and sauna. 1/f: demo pantry, 2/f: replace fireplace. remodel primary and bedroom, 2 bathrooms, 3/f: bathroom remodel and partial renovation. new residential elevator.Details
basement: foundation replacement. full renovation. (n) guest rm, bath and sauna. 1/f: demo pantry, 2/f: replace fireplace. remodel primary and bedroom, 2 bathrooms, 3/f: bathroom remodel and partial renovation. new residential elevator. | $380,000 |
| Jan 29, 2025 | In progress issued Jan 2025 | 3015 Pacific Av | remodel in kind the 3 bathrooms located on the 2nd and 3rd floors.Details
remodel in kind the 3 bathrooms located on the 2nd and 3rd floors. | $20,000 |
| Oct 12, 2023 | In progress issued Oct 2023 | 3368 Jackson St | kitchen and (1) bath remodel. replacement of appliances and fixtures. no change to electric or plumbing. in kind remodelgh: 4164231202Details
kitchen and (1) bath remodel. replacement of appliances and fixtures. no change to electric or plumbing. in kind remodelgh: 4164231202 | $10,000 |
| Jun 5, 2020 | Never finaled issued Jun 2020, no final | 3455 Washington St | remodel of (e) 298 sqft kitchen, 109 sqft level 2 bath #1, 45 sqft level 2 bath #2, 50 sqft level 3 bath #3, 47 sqft level 3 bath #4, and 280 sqft master bath all in-kind. refinish existing flooring and repair drywall as required for new electrical and plumbing.Details
remodel of (e) 298 sqft kitchen, 109 sqft level 2 bath #1, 45 sqft level 2 bath #2, 50 sqft level 3 bath #3, 47 sqft level 3 bath #4, and 280 sqft master bath all in-kind. refinish existing flooring and repair drywall as required for new electrical and plumbing. | $150,000 |
| Jan 25, 2019 | Completed final sign-off Nov 2022 | 2508 Green St | revision to app#201702078776(s1 & s2). deeper basement buildout, additional bath @ 3rd floor, removal of fireplaces, bathroom and bedroom revisions, rear wall, rear door and rear window revisions.Details
revision to app#201702078776(s1 & s2). deeper basement buildout, additional bath @ 3rd floor, removal of fireplaces, bathroom and bedroom revisions, rear wall, rear door and rear window revisions. | |
| Sep 17, 2018 | Never finaled issued Sep 2018, no final | 2625 Scott St | remodel of existing 228 sqft kitchen, 20 sqft powder room, 40 sqft 1st floor bathroom, 72 sqft shared 2nd floor bathroom, and 80 sqft master bathroom in-kind. repaint interior and exterior, refinish existing flooring, replace existing window casements in existing openings.Details
remodel of existing 228 sqft kitchen, 20 sqft powder room, 40 sqft 1st floor bathroom, 72 sqft shared 2nd floor bathroom, and 80 sqft master bathroom in-kind. repaint interior and exterior, refinish existing flooring, replace existing window casements in existing openings. | $20,000 |
| Apr 26, 2018 | Completed final sign-off Jan 2019 | 2740 Pierce St | revision to pa#201801199097 including the addition of architectural & structural plans. add 1/2 bath @ entry level. layout changes to (e) kitchen and bahtrooms. replace windows not visible from street.Details
revision to pa#201801199097 including the addition of architectural & structural plans. add 1/2 bath @ entry level. layout changes to (e) kitchen and bahtrooms. replace windows not visible from street. | |
| Jan 19, 2018 | Completed final sign-off Jan 2019 | 2740 Pierce St | remodel of (e) kitchen in-kind, same location, new wiriing, plumbing, cabinets, fixtures/finishes; remodel main floor bath & master bath in-kind, same location, new finishes/fixtures; replace (2) laundry hook-upDetails
remodel of (e) kitchen in-kind, same location, new wiriing, plumbing, cabinets, fixtures/finishes; remodel main floor bath & master bath in-kind, same location, new finishes/fixtures; replace (2) laundry hook-up | $100,000 |
| Feb 7, 2017 | Completed final sign-off Nov 2022 | 2508 Green St | horizontal addition @ 1st through 3rd levels. 4th floor dormer, bay window @ rear & interior remodel throughout. 1 new full bath @ 1st floor. 1 (e) powder room moved to new location @ 2nd floor. 2 (e) baths moved to new location @ 3rd lfoor. 1 (e) bath moved to new location @ 4th floor.Details
horizontal addition @ 1st through 3rd levels. 4th floor dormer, bay window @ rear & interior remodel throughout. 1 new full bath @ 1st floor. 1 (e) powder room moved to new location @ 2nd floor. 2 (e) baths moved to new location @ 3rd lfoor. 1 (e) bath moved to new location @ 4th floor. | $800,000 |
| Jul 30, 2015 | Completed final sign-off Feb 2017 | 20 16th Av | interior remodel of (e) kitchen 272sf (e) 1/f bathroom, 55sf, (e) 2/f master bath 60sf & (e) kids bathroom (50sf), replace all finishes including tile, drywall, new cabinets & fixtures - no structural work. no exterior work.Details
interior remodel of (e) kitchen 272sf (e) 1/f bathroom, 55sf, (e) 2/f master bath 60sf & (e) kids bathroom (50sf), replace all finishes including tile, drywall, new cabinets & fixtures - no structural work. no exterior work. | $120,000 |
| Jul 20, 2015 | Never finaled issued Jul 2015, no final | 233 Franconia St | the interior remodel of (e) kitchen, 1/f bath & 2/f bath in-kind. no structural or exterior work. remove (e) finishes, install new drywall, electrical, plumbing & cabinets & flooring. kitchen 120sf, bath 1 40sf, bath 2: 40sf.Details
the interior remodel of (e) kitchen, 1/f bath & 2/f bath in-kind. no structural or exterior work. remove (e) finishes, install new drywall, electrical, plumbing & cabinets & flooring. kitchen 120sf, bath 1 40sf, bath 2: 40sf. | $52,000 |
| Feb 5, 2015 | Completed final sign-off Sep 2018 | 2535 Laguna St | new rear yard addition (2 story over basement). window repair/replacement, seismic retrofit/upgrade. relocate some interior partitions, new 1/2 bath, remodel bathrooms and kitchen.Details
new rear yard addition (2 story over basement). window repair/replacement, seismic retrofit/upgrade. relocate some interior partitions, new 1/2 bath, remodel bathrooms and kitchen. | $150,000 |
| Oct 2, 2014 | Completed final sign-off Nov 2016 | 910 Clayton St | upper unit - select demolition of the (e) kitchen, powder room, master bath and 2/f hallway powder room; all work within envelop; no structural work, kitchen and bath remodel. to comply with cec2150.0(k)3 & 5Details
upper unit - select demolition of the (e) kitchen, powder room, master bath and 2/f hallway powder room; all work within envelop; no structural work, kitchen and bath remodel. to comply with cec2150.0(k)3 & 5 | $3,000 |
| May 27, 2011 | Never finaled issued May 2011, no final | 59 Manzanita Av | replace extg ground floor rear yard wndows with new doors.new skylights interior remodel to include finishes update, kitchen and bathroom remodel,new electrical and plmbg. new interior stair to replace extg. legalize wetbar.Details
replace extg ground floor rear yard wndows with new doors.new skylights interior remodel to include finishes update, kitchen and bathroom remodel,new electrical and plmbg. new interior stair to replace extg. legalize wetbar. | $170,000 |
| Jan 4, 2011 | Completed final sign-off Jun 2011 | 2950 Vallejo St | no exterior changes, bathrooms to be remodeled, existing 2 half baths and 1 full bath. no change to walls, window or doors, lighting changes to comply w/cec 150(k)Details
no exterior changes, bathrooms to be remodeled, existing 2 half baths and 1 full bath. no change to walls, window or doors, lighting changes to comply w/cec 150(k) | $18,000 |
| Dec 15, 2010 | Completed final sign-off Jun 2011 | 2950 Vallejo St | remodel of kitchen, remodel 1-half bath, remodel 4-full baths.Details
remodel of kitchen, remodel 1-half bath, remodel 4-full baths. | $67,000 |
| Dec 2, 2010 | Completed final sign-off May 2011 | 3643 Folsom St | 2nd fl remodel. new kitchen, bath, flooring, structural upgrades, windowsDetails
2nd fl remodel. new kitchen, bath, flooring, structural upgrades, windows | $95,000 |
| Mar 22, 2010 | Completed final sign-off Aug 2010 | 135 Belgrave Av | kitchen & bathroom remodel. window installation ( 1 of 6 windows in front of the house). structural changes to interior walls.Details
kitchen & bathroom remodel. window installation ( 1 of 6 windows in front of the house). structural changes to interior walls. | $50,000 |
| Sep 21, 2009 | Completed final sign-off Dec 2009 | 164 Dolores St | kitchen & bathroom remodel - new floors, counters, cabinets (partial), new plumbing fixtures in existing location, w/orelocate, minor wall demolition.Details
kitchen & bathroom remodel - new floors, counters, cabinets (partial), new plumbing fixtures in existing location, w/orelocate, minor wall demolition. | $30,000 |
| May 5, 2009 | Completed final sign-off Jul 2009 | 2830 Golden Gate Av | addition of bathroom shower main floor of house. scope: removal of partition wall dividing toilet room and closet. add shower, vanity sink, rough/finish plumbing gfi recep. removal of window, frame in, add siding, verify walls are non bearing, add 1 (n) exhaust fanDetails
addition of bathroom shower main floor of house. scope: removal of partition wall dividing toilet room and closet. add shower, vanity sink, rough/finish plumbing gfi recep. removal of window, frame in, add siding, verify walls are non bearing, add 1 (n) exhaust fan | $14,800 |
| May 1, 2009 | Completed final sign-off Jun 2009 | 462 Douglass St | repair damaged framing, sheathing, siding due to water intrusion. located from master bath, ext. wall & corner; down to lower floor office . replace in kind (all materials) re-use (e) windows. replacement work area approx. 150 sf.Details
repair damaged framing, sheathing, siding due to water intrusion. located from master bath, ext. wall & corner; down to lower floor office . replace in kind (all materials) re-use (e) windows. replacement work area approx. 150 sf. | $10,000 |
| Mar 16, 2009 | Completed final sign-off Jul 2009 | 771 Wisconsin St | (unit #771a wisconsin) bathroom remodel, remove partition wall, frame new wall, tiled shower.Details
(unit #771a wisconsin) bathroom remodel, remove partition wall, frame new wall, tiled shower. | $20,000 |
| Mar 10, 2009 | Completed final sign-off Jul 2009 | 771 Wisconsin St | kitchen remodel -cabinets, counter, hood vent. at least half of the lighting wattage in kitchen shall be fluorescent. samll sheetrock. bathroom remodel - tile shower (tub removed), new sink & toilet sheetrock. provide fluorescent light or o.s. in bathroom. no other work under this permit.Details
kitchen remodel -cabinets, counter, hood vent. at least half of the lighting wattage in kitchen shall be fluorescent. samll sheetrock. bathroom remodel - tile shower (tub removed), new sink & toilet sheetrock. provide fluorescent light or o.s. in bathroom. no other work under this permit. | $60,000 |
| Nov 3, 2008 | Expired or cancelled expired Feb 2011 | 2133 Filbert St | kitchen & bathroom remodel. replace new kitchen cabinets & appliances. replace new tile shower & tiled floor.Details
kitchen & bathroom remodel. replace new kitchen cabinets & appliances. replace new tile shower & tiled floor. | $75,000 |
| Jul 7, 2008 | Completed final sign-off Nov 2008 | 1322 Dolores St | new kitchen cabinets/counters. remodel (2) kitchens. remodel 2 bathrooms. paint, tile flooring, lighting/electrical/plumbing.Details
new kitchen cabinets/counters. remodel (2) kitchens. remodel 2 bathrooms. paint, tile flooring, lighting/electrical/plumbing. | $90,000 |
| Mar 13, 2008 | Completed final sign-off Sep 2008 | 2587 Post St | 3 kitchen remodels, 6 bathroom remodels, exterior paint, interior paint and new flooringDetails
3 kitchen remodels, 6 bathroom remodels, exterior paint, interior paint and new flooring | $248,000 |
| Feb 11, 2008 | Completed final sign-off Jun 2008 | 3923 Sacramento St | work in 3923a & b sacramento st. replace kitchen cabinets, counter, appliances, replace kitchen tile flooring, replace bathroom flooring, toilet, sink. interior/exterior paint. no changes to size of rooms.Details
work in 3923a & b sacramento st. replace kitchen cabinets, counter, appliances, replace kitchen tile flooring, replace bathroom flooring, toilet, sink. interior/exterior paint. no changes to size of rooms. | $75,000 |