Permit GraphShortlistSan Francisco building permits since 2000

Fairway Design & Construction

Contractor license
923234
State license record
Based in
San Rafael
On San Francisco permits
Jan 2010 to Dec 2016
Last 24 months
0 permits filed

10 permits since 2000: 10 completed.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Kitchen remodel permits

AllDeck 1Stairs 1Kitchen remodel 2Bathroom remodel 2

2 kitchen remodel permits: 2 completed. Typically 14 days from filing to permit and 362 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Jul 14, 2016Completed
final sign-off Jun 2017
2031 Hayes Stremodel 2 flats. not visible from street. convert e bath to n full bath and add bedroom in e living room. remodel kitchen as shown. no work to e ground fl rooms
Details
Permit
201607142410
Status
complete
Filed
Jul 14, 2016
Permit issued
Jul 20, 2016
Final sign-off
Jun 27, 2017
Declared cost
$135,000
Address
2031 Hayes St

remodel 2 flats. not visible from street. convert e bath to n full bath and add bedroom in e living room. remodel kitchen as shown. no work to e ground fl rooms

Open the permit page

$135,000
Oct 6, 2014Completed
final sign-off Nov 2015
5328 Anza Strepair fire, smoke & water damaged residence. remove (e) unwarranted unit, reconfigure lower level to make one legal unit. remove part of wall between kitchen and dining on 2nd floor unit.
Details
Permit
201410068116
Status
complete
Filed
Oct 6, 2014
Permit issued
Oct 28, 2014
Final sign-off
Nov 13, 2015
Declared cost
$180,000
Address
5328 Anza St

repair fire, smoke & water damaged residence. remove (e) unwarranted unit, reconfigure lower level to make one legal unit. remove part of wall between kitchen and dining on 2nd floor unit.

Open the permit page

$180,000