Back to bathroom remodel contractors
Fairway Design & Construction
- Based in
- San Rafael
- On San Francisco permits
- Jan 2010 to Dec 2016
- Last 24 months
- 0 permits filed
10 permits since 2000: 10 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 4 days from filing to permit and 260 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 28, 2016 | Completed final sign-off Jun 2017 | 2033 Hayes St | add bathroom in bedroom at 2nd fl residential flat . no exterior changes. interior only. revision to 201607142410Details
add bathroom in bedroom at 2nd fl residential flat . no exterior changes. interior only. revision to 201607142410 | $10,000 |
| Jul 14, 2016 | Completed final sign-off Jun 2017 | 2031 Hayes St | remodel 2 flats. not visible from street. convert e bath to n full bath and add bedroom in e living room. remodel kitchen as shown. no work to e ground fl roomsDetails
remodel 2 flats. not visible from street. convert e bath to n full bath and add bedroom in e living room. remodel kitchen as shown. no work to e ground fl rooms | $135,000 |